scholarly journals Real-Time Motion Generation and Control Systems for High Wheel-Legged Robot Mobility

2014 ◽  
Vol 61 (7) ◽  
pp. 3648-3659 ◽  
Author(s):  
Akihiro Suzumura ◽  
Yasutaka Fujimoto
2012 ◽  
Vol 182-183 ◽  
pp. 1673-1680
Author(s):  
Yu Wang ◽  
Ri Na Su

A kind of 3-RPS and 3-DOF parallel robotic mechanisms is used as motion-sensible-platform of gun training simulator to implement the motion simulation. Its dynamics is analyzed and driving force of joint is gained. This paper introduces the study on motion generation of gun training simulator. The moving model of gun is established on the basis of the model of vehicle. We solve the pose of gun by applying the theory of homogeneous matrix. In order to ensure actuators moving at a preset speed and enable the motion-sensible-platform to perform a real-time moving posture simulation of a wheeled gun vehicle in running, the speed equation of actuator is given. The feasibility of models was tested through the simulation experiments. All of these works are beneficial to optimize design and control realization of motion platform structure.


Impact ◽  
2020 ◽  
Vol 2020 (8) ◽  
pp. 60-61
Author(s):  
Wei Weng

For a production system, 'scheduling' aims to find out which machine/worker processes which job at what time to produce the best result for user-set objectives, such as minimising the total cost. Finding the optimal solution to a large scheduling problem, however, is extremely time consuming due to the high complexity. To reduce this time to one instance, Dr Wei Weng, from the Institute of Liberal Arts and Science, Kanazawa University in Japan, is leading research projects on developing online scheduling and control systems that provide near-optimal solutions in real time, even for large production systems. In her system, a large scheduling problem will be solved as distributed small problems and information of jobs and machines is collected online to provide results instantly. This will bring two big changes: 1. Large scheduling problems, for which it tends to take days to reach the optimal solution, will be solved instantly by reaching near-optimal solutions; 2. Rescheduling, which is still difficult to be made in real time by optimization algorithms, will be completed instantly in case some urgent jobs arrive or some scheduled jobs need to be changed or cancelled during production. The projects have great potential in raising efficiency of scheduling and production control in future smart industry and enabling achieving lower costs, higher productivity and better customer service.


2013 ◽  
Vol 25 (10) ◽  
pp. 2325-2342 ◽  
Author(s):  
Song Han ◽  
Kam-Yiu Lam ◽  
Jiantao Wang ◽  
Krithi Ramamritham ◽  
Aloysius K. Mok

Sign in / Sign up

Export Citation Format

Share Document