Development of Risk Assessment Code Supplements for the UK Pipeline Codes IGE/TD/1 and PD 8010

Author(s):  
Graham D. Goodfellow ◽  
Jane V. Haswell ◽  
Rod McConnell ◽  
Neil W. Jackson

The United Kingdom Onshore Pipeline Operators Association (UKOPA) was formed by UK pipeline operators to provide a common forum for representing pipeline operators interests in the safe management of pipelines. This includes ensuring that UK pipeline codes include best practice, and that there is a common view in terms of compliance with these codes. Major hazard cross country pipelines are laid on 3rd party land, and in general have an operational life typically greater than 50 years. The land use in the vicinity of any pipeline will change with time, and buildings will be constructed adjacent to the pipeline route. This can result in population density and proximity infringements, and the pipeline becoming non-compliant with the code. Accordingly, a land use planning system is applied so that the safety of, and risk to, developments in the vicinity of major hazard pipelines are assessed at the planning stage. In the UK, the Health & Safety Executive (HSE) are statutory consultees to this process, and they set a quantitative risk-based consultation zone around major hazard pipelines, where the risks to people and developments must be assessed. Quantitative risk assessment (QRA) requires expertise, and the results obtained are dependent upon consequence and failure models, input data, assumptions and criteria. UKOPA has worked to obtain cross-stakeholder agreement on how QRA is applied to land use planning assessments. A major part of the strategy to achieve this was the development of supplements for the UK design codes IGE/TD/1 and PD 8010, to provide authoritative and accepted guidance on the risk analysis of: i) Site specific pipeline details, for example increased wall thickness, pipeline protection (such as slabbing), depth of cover, damage type and failure mode, and ii) The impact of mitigation measures which could be applied as part of the development. The availability of this codified advice would ensure a standard and consistent approach, and reduce the potential for disagreement between stakeholders on the acceptability of proposed developments. This paper describes the guidance given in these code supplements in relation to consequence modelling, prediction of failure frequency, application of risk criteria, implementation of risk mitigation and summaries the assessment example provided.

Author(s):  
Graham D. Goodfellow ◽  
Jane V. Haswell ◽  
Neil W. Jackson ◽  
Roger Ellis

The United Kingdom Onshore Pipeline Operators Association (UKOPA) was formed by UK pipeline operators to provide a common forum for representing pipeline operators interests in the safe management of pipelines. This includes ensuring that UK pipeline codes include best practice, and that there is a common view in terms of compliance with these codes. Quantitative risk assessment (QRA) is used by operators in the UK to determine if individual and societal risk levels at new developments adjacent to existing pipelines are as low as reasonably practicable (ALARP). In 2008 the UKOPA Risk Assessment Working Group developed codified advice on the use of QRA applied to land use planning assessments, which was published by the Institution of Gas Engineers & Managers (IGEM) and the British Standards Institute (BSI). This advice was designed to ensure a standard and consistent approach, and reduce the potential for disagreement between stakeholders on the acceptability of proposed developments. Since publication of IGEM/TD/2 and PD8010-3 in 2008, feedback from users of the guidance together with new research work and additional discussions with the UK safety regulator, the Health & Safety Executive (HSE), have been undertaken and the codified advice has been revised and reissued in June 2013. This paper describes the revisions to the guidance given in these codes in relation to: • Clarification on application • Update of physical risk mitigation measures (slabbing and depth of cover) • Update of HSE approach to Land Use Planning • Update of failure frequency data: ○ Weibull damage distributions for external interference ○ Generic failure frequency curve for external interference ○ Prediction of failure frequency due to landsliding The revised codes, and their content, are considered to represent the current UK best practice in pipeline QRA.


1993 ◽  
Vol 11 (2) ◽  
pp. 213-231 ◽  
Author(s):  
R F Imrie ◽  
P E Wells

In the last decade access for disabled people to public buildings has become an important part of the political agenda. Yet, one of the main forms of discrimination which still persists against disabled people is an inaccessible built environment. In particular, statutory authorities have been slow to acknowledge the mobility and access needs of disabled people, and the legislative base to back up local authority policies remains largely ineffectual and weak. In this paper, the interrelationships between disability and the built environment are considered by focusing on the role of the UK land-use planning system in securing access provision for disabled people.


1998 ◽  
Vol 16 (4) ◽  
pp. 379-394 ◽  
Author(s):  
A Hull ◽  
G Vigar

The authors examine the role of development plans in managing spatial change, The impact of the enhanced status of the development plan in the UK context is assessed with the aid of research material drawn from detailed case studies in Lancashire and Kent. Two governance ‘episodes’ are highlighted: a highly structured game within the mainstream planning system; and an innovative private-sector-led approach to planning for an area with the potential for rapid change. By means of these two illustrations the authors indicate the importance of the processes of development-plan preparation in the local context, the political tensions inherent to the land-use planning system in managing growth, and explore notions of plans being a store of local consensus about future spatial change.


Soil Research ◽  
2016 ◽  
Vol 54 (1) ◽  
pp. 94 ◽  
Author(s):  
Iris Vogeler ◽  
Rogerio Cichota ◽  
Josef Beautrais

Investigation of land-use and management changes at regional scales require the linkage of farm-system models with land-resource information, which for pastoral systems includes forage supply. The New Zealand Land Resource Inventory (NZLRI) and associated Land Use Capability (LUC) database include estimates of the potential stock-carrying capacity across the country, which can be used to derive estimates of average annual pasture yields. Farm system models and decision support tools, however, require information on the seasonal patterns of pasture growth. To generate such pasture growth curves (PGCs), the Agricultural Production Systems Simulator (APSIM) was used, with generic soil profiles based on descriptions of LUC classes, to generate PGCs for three regions of New Zealand. Simulated annual pasture yields were similar to the estimates of annual potential pasture yield in the NZLRI spatial database, and they provided information on inter-annual variability. Simulated PGCs generally agreed well with measured long-term patterns of seasonal pasture growth. The approach can be used to obtain spatially discrete estimates of seasonal pasture growth patterns across New Zealand for use in farm system models and for assessing the impact of management practices and climate change on the regional sustainability.


Author(s):  
Nicholas Addai Boamah

The potential of property rate has been least tapped by decentralized governments in Ghana. This paper investigates the property rating system in Ghana through a case study of Offinso South Municipality (OSM). Questionnaires were used to gather empirical data from property owners in the municipality. The paper finds that there is inadequate property tax administration system and high public disdain for the property tax in OSM, with a significant association between compliance with the property tax and land use regulations in OSM. The paper suggests that the Offinso South Municipal Assembly (OSMA) should improve its land use planning system to facilitate voluntary compliance with the property tax. OSMA should also address accountability and transparency problems in the property tax system in order to increase public confidence in the tax regime. The OSMA should also improve on the property tax collection modes by computerising the billing and collection processes.


Sign in / Sign up

Export Citation Format

Share Document