scholarly journals Replacement of Cable Stays in Yonghe Bridge in Tianjin, China

2020 ◽  
Vol 2020 ◽  
pp. 1-17
Author(s):  
Hongjiang Li

Cable replacement is one of the most important approaches for retrofitting an existing cable-stayed bridge. The Yonghe Bridge opened to traffic in 1987 and was the largest concrete cable-stayed bridge in Asia at the time. After nearly 20 years in service, its stay-cable system was completely replaced. The present paper details the key technical points of cable replacement in this bridge, including causes of replacement, cable replacement design, construction monitoring during replacement, and cable tension tuning after replacement. Based on the measurements during construction, the variation in structural condition indexes was thoroughly investigated, such as cable forces throughout the bridge, geometry profile of bridge deck, and tower horizontal displacements. The structural changes due to cable replacement were evaluated, and then, a relatively desirable scheme of cable adjustment was correspondingly put forward. The measured results showed that, influenced by the accumulated tolerances of cable forces during construction, cable replacement may often lead to a further deviation of structural condition. In this instance, cable adjustment is an effective compensation measure to improve the overall structural condition of the bridge. The practice of cable replacement in the Yonghe Bridge has provided some valuable experience or beneficial references for the similar retrofitting cases.

2011 ◽  
Vol 90-93 ◽  
pp. 1074-1081 ◽  
Author(s):  
Hong Jiang Li

Tension rocker bearing (TRB) cables installed at auxiliary piers were critical members to sustain the structural system in a prestressed concrete cable-stayed bridge. Once these cables fractured or broken, its structural system would be transferred. Based on diseases caused by fracture of TRB cables in Yonghe Bridge, corresponding maintenance or strengthening measures were described in detail. These measures included replacement of TRB cables, strengthening of the closure segment of main girder at each side span, and adjustment of stay cable forces. Monitoring results showed that, its structural system was finally and completely rehabilitated, and the safety factor of new TRB cables is enough under the most unfavorable load combination. Moreover, the line shape of main girder and the inclined displacement at the top of each pylon were improved effectively. Thus, Yonghe Bridge accumulated some valuable experience for maintenance or strengthening of existing prestressed concrete cable-stayed bridges, and also made a useful exploration.


2021 ◽  
Author(s):  
Li Dong ◽  
Bin Xie ◽  
Dongli Sun ◽  
Yizhuo Zhang

<p>Cable forces are primary factors influencing the design of a cable-stayed bridge. A fast and practical method for cable force estimation is proposed in this paper. For this purpose, five input parameters representing the main characteristics of a cable-stayed bridge and two output parameters representing the cable forces in two key construction stages are defined. Twenty different representative cable-stayed bridges are selected for further prediction. The cable forces are carefully optimized through finite element analysis. Then, discrete and fuzzy processing is applied in data processing to improve their reliability and practicality. Finally, based on the input parameters of a target bridge, the maximum possible output parameters are calculated by Bayes estimation based on the processed data. The calculation results show that the average prediction error of this method is less than 1% for the twenty bridges themselves, which provide the primary data and less than 3% for an under-construction bridge.</p>


Author(s):  
Chet Chie Voon ◽  
Hiang Miang Goh ◽  
Chuan Seng Koo

<p>The construction of the Pulau Poh cable-stayed bridge has been challenging both technically and environmentally. The curved pylon shape in two planes, with changing cross section and heavily congested reinforcement pose constructability concerns. Accurate geometry control and positioning of stay cable anchorages within the pylon is crucial to ensure the bridge meets its intended design life. Located in an area with high rainfall intensity presents additional environmental challenges, where working areas are constantly submerged. To address the challenges and meet the project deadline, innovative construction methodologies are being adopted. The bridge design was also revisited, taking into consideration the construction approach. This paper aims to explain the challenges faced and methods used to fast track the construction of the Pulau Poh cable-stayed bridge.</p>


2018 ◽  
Vol 4 (4) ◽  
pp. 137 ◽  
Author(s):  
Alemdar Bayraktar ◽  
Ashraf Ashour ◽  
Halil Karadeniz ◽  
Altok Kurşun ◽  
Arif Erdiş

An accurate numerical analysis of the behavior of long-span cable-stayed bridges under environmental effects is a challenge because of complex, uncertain and varying environmental meteorology. This study aims to investigate in-situ experimental structural behavior of long-span steel cable-stayed bridges under environmental effects such as air temperature and wind using the monitoring data. Nissibi cable-stayed bridge with total length of 610m constructed in the city of Adıyaman, Turkey, in 2015 is chosen for this purpose. Structural behaviors of the main structural elements including deck, towers (pylons) and cables of the selected long span cable-stayed bridge under environmental effects such as air temperature and wind are investigated by using daily monitoring data. The daily variations of cable forces, cable accelerations, pylon accelerations and deck accelerations with air temperature and wind speed are compared using the hottest summer (July 31, 2015) and the coldest winter (January 1, 2016) days data.


Author(s):  
Olivier Boujard ◽  
Ste´phane Pernot ◽  
Alain Berlioz ◽  
Claude Lamarque

Recent experimental campaigns led on the Iroise cable stayed bridge near Brest, France, revealed repeated vibratory events in some cable stays likely to provoke durability problems. A spectral analysis emphasized two regimes in which either the fundamental or the third cable mode were excited. Yet, wavelet scalograms of tests allowed to exhibit a global pylon mode excited by traffic environment through deck-cable-tower interaction and which again excites local cable modes by means of a nonlinear parametric resonance mechanism with vertical bending modes of the girder. Preliminary results are introduced as an attempt to explain such a scenario.


2014 ◽  
Vol 501-504 ◽  
pp. 1174-1177
Author(s):  
Xiao Ming Du ◽  
Nan Li

The stayed cable is the key part of the cable-stayed bridge and the main bearing section. Stay cables are prone to vibration under the loads of the rains winds, earthquakes and transportation for the long-span bridge is very flexible and the damping is small. A long time effect of cable vibration on the structure durability has become a serious problem of cable-stayed bridge in the development and operation. Wind induced vibration of stay cable shape is analyzed, and some common damping measures are expounded in the article and it provides the basis for further study in the future.


2014 ◽  
Vol 2014 ◽  
pp. 1-13 ◽  
Author(s):  
Hao Wang ◽  
Tianyou Tao ◽  
Tong Guo ◽  
Jian Li ◽  
Aiqun Li

The structural health monitoring system (SHMS) provides an effective tool to conduct full-scale measurements on existing bridges for essential research on bridge wind engineering. In July 2008, Typhoon Fung-Wong lashed China and hit Sutong cable-stayed bridge (SCB) in China. During typhoon period, full-scale measurements were conducted to record the wind data and the structural vibration responses were collected by the SHMS installed on SCB. Based on the statistical method and the spectral analysis technique, the measured data are analyzed to obtain the typical parameters and characteristics. Furthermore, this paper analyzed the measured structural vibration responses and indicated the vibration characteristics of the stay cable and the deck, the relationship between structural vibrations and wind speed, the comparison of upstream and downstream cable vibrations, the effectiveness of cable dampers, and so forth. Considering the significance of damping ratio in vibration mitigation, the modal damping ratios of the SCB are identified based on the Hilbert-Huang transform (HHT) combined with the random decrement technique (RDT). The analysis results can be used to validate the current dynamic characteristic analysis methods, buffeting calculation methods, and wind tunnel test results of the long-span cable-stayed bridges.


2012 ◽  
Vol 18 (19) ◽  
pp. 811-818 ◽  
Author(s):  
Paweł Hawryszków ◽  
Maciej Hildebrand
Keyword(s):  