The impact of socio-economic deprivation on airway obstruction and inflammation in children with severe asthma: analysis of a tertiary regional clinic in the UK

Author(s):  
Philip Lawrence ◽  
Claire Hepworth ◽  
Neil Mingaud ◽  
Justus Simba ◽  
Ian Sinha
Author(s):  
SJ Smith ◽  
J Busby ◽  
LG Heaney ◽  
PE Pfeffer ◽  
DJ Jackson ◽  
...  
Keyword(s):  
The Uk ◽  

2020 ◽  
pp. 00768-2020
Author(s):  
Steven J. Smith ◽  
John Busby ◽  
Liam G. Heaney ◽  
Paul E. Pfeffer ◽  
David J. Jackson ◽  
...  

Author(s):  
C. Claire Thomson

This chapter traces the early history of state-sponsored informational filmmaking in Denmark, emphasising its organisation as a ‘cooperative’ of organisations and government agencies. After an account of the establishment and early development of the agency Dansk Kulturfilm in the 1930s, the chapter considers two of its earliest productions, both process films documenting the manufacture of bricks and meat products. The broader context of documentary in Denmark is fleshed out with an account of the production and reception of Poul Henningsen’s seminal film Danmark (1935), and the international context is accounted for with an overview of the development of state-supported filmmaking in the UK, Italy and Germany. Developments in the funding and output of Dansk Kulturfilm up to World War II are outlined, followed by an account of the impact of the German Occupation of Denmark on domestic informational film. The establishment of the Danish Government Film Committee or Ministeriernes Filmudvalg kick-started aprofessionalisation of state-sponsored filmmaking, and two wartime public information films are briefly analysed as examples of its early output. The chapter concludes with an account of the relations between the Danish Resistance and an emerging generation of documentarists.


Author(s):  
Tochukwu Moses ◽  
David Heesom ◽  
David Oloke ◽  
Martin Crouch

The UK Construction Industry through its Government Construction Strategy has recently been mandated to implement Level 2 Building Information Modelling (BIM) on public sector projects. This move, along with other initiatives is key to driving a requirement for 25% cost reduction (establishing the most cost-effective means) on. Other key deliverables within the strategy include reduction in overall project time, early contractor involvement, improved sustainability and enhanced product quality. Collaboration and integrated project delivery is central to the level 2 implementation strategy yet the key protocols or standards relative to cost within BIM processes is not well defined. As offsite construction becomes more prolific within the UK construction sector, this construction approach coupled with BIM, particularly 5D automated quantification process, and early contractor involvement provides significant opportunities for the sector to meet government targets. Early contractor involvement is supported by both the industry and the successive Governments as a credible means to avoid and manage project risks, encourage innovation and value add, making cost and project time predictable, and improving outcomes. The contractor is seen as an expert in construction and could be counter intuitive to exclude such valuable expertise from the pre-construction phase especially with the BIM intent of äóÖbuild it twiceäó», once virtually and once physically. In particular when offsite construction is used, the contractoräó»s construction expertise should be leveraged for the virtual build in BIM-designed projects to ensure a fully streamlined process. Building in a layer of automated costing through 5D BIM will bring about a more robust method of quantification and can help to deliver the 25% reduction in overall cost of a project. Using a literature review and a case study, this paper will look into the benefits of Early Contractor Involvement (ECI) and the impact of 5D BIM on the offsite construction process.


Sign in / Sign up

Export Citation Format

Share Document