Unified design method of urban NATM and shield tunneling method

Author(s):  
Y. Nagayama ◽  
Y. Okabe ◽  
S. Sakurai
2021 ◽  
Vol 13 (7) ◽  
pp. 168781402110343
Author(s):  
Mei Yang ◽  
Yimin Xia ◽  
Lianhui Jia ◽  
Dujuan Wang ◽  
Zhiyong Ji

Modular design, Axiomatic design (AD) and Theory of inventive problem solving (TRIZ) have been increasingly popularized in concept design of modern mechanical product. Each method has their own advantages and drawbacks. The benefit of modular design is reducing the product design period, and AD has the capability of problem analysis, while TRIZ’s expertise is innovative idea generation. According to the complementarity of these three approaches, an innovative and systematic methodology is proposed to design big complex mechanical system. Firstly, the module partition is executed based on scenario decomposition. Then, the behavior attributes of modules are listed to find the design contradiction, including motion form, spatial constraints, and performance requirements. TRIZ tools are employed to deal with the contradictions between behavior attributes. The decomposition and mapping of functional requirements and design parameters are carried out to construct the structural hierarchy of each module. Then, modules are integrated considering the connections between each other. Finally, the operation steps in application scenario are designed in temporal and spatial dimensions. Design of cutter changing robot for shield tunneling machine is taken as an example to validate the feasibility and effectiveness of the proposed method.


2014 ◽  
Vol 580-583 ◽  
pp. 1013-1018 ◽  
Author(s):  
Hui Feng Su ◽  
Wei Ning Liu ◽  
Fu Chun Liu

Confronting with the difficulties of the construction metro station in the Northeast of China, a new idea of shield method combined prefabricated method is put forward. In the paper the research status of the underground engineering precast assembly technology was analyzed and classified firstly. The method of single round interval shield combined with open-cut (or covered excavation) prefabricated sections and on the basis of shield tunnel to build single arch station is especially worth studying and promotion. Then the key prefabricate theory needing to deal with such as how to calculating the spring stiffness and so forth of the calculating model. The key technology such as joint formation, waterproof and the other of shield method combined with prefabricated method was discussed.


Author(s):  
Setsuo Takaku ◽  
Masayuki Matsuura ◽  
Yasushi Nagashima ◽  
Yoichi Moriya

2020 ◽  
Vol 2020 ◽  
pp. 1-9
Author(s):  
Zhiyong Yang ◽  
Yaowen Ding ◽  
Yusheng Jiang ◽  
Kuanda Fang ◽  
Linwei Dong ◽  
...  

In this study, the reasonable construction sequence of an overlapping tunnel shield is investigated. Taking the overlapping tunnel of Tianjin Metro Line 5 as the background, a three-dimensional numerical model was established using Flac3D software to study the influence of the “first up and then down” and “first down and then up” construction sequences of the overlapping tunnel on the surface settlement, stratum displacement, lining radial stress, and displacement. The research results show that the shape and width of the final settlement tank on the ground under the two conditions are basically the same, and the difference between the maximum cumulative settlements is small. The accumulated ground settlement caused by the first up and then down construction sequence is 1.8 mm larger than that caused by the first down and then up sequence. The difference between the two working conditions on the vertical displacement of the stratum mainly occurs in the middle stratum of the upper and lower tunnels, and the proportion of the strata in the uplifted state and subsidence state is different. The construction sequence has little effect on the radial stress on the lining of the upper and lower tunnels. Under these two conditions, the excavation of the second tunnel causes a small change in the radial stress of the preceding tunnel lining, both within 4.2%. Under the working condition of first down and then up, the construction of the second tunnel causes the lining of the preceding tunnel to rise by 7.2∼9.2 mm. Under the condition of first up and then down, the construction of the second tunnel causes the lining of the preceding tunnel to sink again by 9.1∼10.4 mm. By comparing the effects of the two working conditions on the stratum and the tunnel lining, it is recommended that the construction be carried out in the order of first down and then up.


2016 ◽  
Vol 34 (4) ◽  
pp. 1155-1169 ◽  
Author(s):  
Bo Li ◽  
Li Wu ◽  
Changmao Xu ◽  
Qingjun Zuo ◽  
Shuanglan Wu ◽  
...  

1995 ◽  
Vol 31 (4) ◽  
pp. 461-470
Author(s):  
Shogo TANAKA ◽  
Tetsuya KANAMI ◽  
Yukihiro TERADA ◽  
Takaharu KITAMURA