Fuel and non-fuel vehicle operating costs comparison of select vehicle types and fuel sources: A parametric study

Author(s):  
Rami Chkaiban ◽  
Elie Y. Hajj ◽  
Gary Bailey ◽  
Muluneh Sime ◽  
Hao Xu ◽  
...  
Author(s):  
M. T. Dineen

The production of rubber modified thermoplastics can exceed rates of 30,000 pounds per hour. If a production plant needs to equilibrate or has an upset, that means operating costs and lost revenue. Results of transmission electron microscopy (TEM) can be used for process adjustments to minimize product loss. Conventional TEM, however, is not a rapid turnaround technique. The TEM process was examined, and it was determined that 50% of the time it took to complete a polymer sample was related to film processing, even when using automated equipment. By replacing the conventional film portion of the process with a commercially available system to digitally acquire the TEM image, a production plant can have the same TEM image in the control room within 1.5 hours of sampling.A Hitachi H-600 TEM Operated at 100 kV with a tungsten filament was retrofitted with a SEMICAPS™ image collection and processing workstation and a KODAK MEGAPLUS™ charged coupled device (CCD) camera (Fig. 1). Media Cybernetics Image-Pro Plus software was included, and connections to a Phaser II SDX printer and the network were made. Network printers and other PC and Mac software (e.g. NIH Image) were available. By using digital acquisition and processing, the time it takes to produce a hard copy of a digital image is greatly reduced compared to the time it takes to process film.


Liquidity ◽  
2016 ◽  
Vol 5 (1) ◽  
pp. 53-64
Author(s):  
Yumniati Agustina

Investigation in various regions in Indonesia found indications of the alleged fraud that result from unccountable use and management of BOS funds. Among the findings, including payments that do not fit the technical guidelines, no accountability report, and the use of funds with unaccountable receipt. In the Regulation of the Minister of Education and Culture of the Republic of No. 161/2014, stated that: BOS is a government program that is basically forfunding the nonpersonnel operating costs of the primary education as the implementer of compulsory education program. The purpose of this study were (1) to analyze the accounting cycle and financial accountability for the use of BOS funds in the 2015, (2) to analyze the compliance of the accounting cycle and financial accountability of the BOS funds, (3) to analyze the transparency and accountability of BOS fund’s reports. The observed elementary school is SDIT X in Depok, West Java. Result shows that they do not fully compliance to the appropriate regulatory technical guidelines. On the other hand, the transparency and accountability issues show that: (1) BOS Management Team, Teachers Council and School’s Committee’s involvement in the BOS fund management, and (2) evaluation and comparison of the final report of prior periods, so that transparency and accountability of the use and management of BOS funds can be improved.


2020 ◽  
Vol 2 (1) ◽  
pp. 19-24
Author(s):  
Sakhr Mohammed Sultan ◽  
Chih Ping Tso ◽  
Ervina Efzan Mohd Noor ◽  
Fadhel Mustafa Ibrahim ◽  
Saqaff Ahmed Alkaff

Photovoltaic Thermal Solar Collector (PVT) is a hybrid technology used to produce electricity and heat simultaneously. Current enhancements in PVT are to increase the electrical and thermal efficiencies. Many PVT factors such as type of absorber, thermal conductivity, type of PV module and operating conditions are important parameters that can control the PVT performance. In this paper, an analytical model, using energy balance equations, is studied for PVT with an improved parallel flow absorber. The performance is calculated for a typical sunny weather in Malaysia. It was found that the maximum electrical and thermal efficiencies are 12.9 % and 62.6 %, respectively. The maximum outlet water temperature is 59 oC.


Sign in / Sign up

Export Citation Format

Share Document