A Combinatorial Heuristic Approach for Solving Real-Size Machinery Location and Road Design Problems in Forestry Planning

2006 ◽  
Vol 54 (6) ◽  
pp. 1017-1027 ◽  
Author(s):  
Rafael Epstein ◽  
Andrés Weintraub ◽  
Pedro Sapunar ◽  
Enrique Nieto ◽  
Julian B. Sessions ◽  
...  
Transport ◽  
2013 ◽  
Vol 30 (1) ◽  
pp. 92-102 ◽  
Author(s):  
Shahab Kermanshahi ◽  
Yousef Shafahi ◽  
Mehdi Bagherian

The problem of Rapid Transit Network Design (RTND) is studied in this paper. Due to the noticeable contribution of rapid transit lines in public transportation network of large urban areas, this problem is interesting to the transportation specialists. On the other hand, the success stories of Bus Rapid Transit (BRT) systems in different countries have motivated us to study BRT network planning. BRT systems can be developed with less investment costs and construction time in comparison with rail-based systems. Therefore, planning Bus Rapid Transit lines, either to develop a new rapid transit network or extend a current one can be an interesting research topic. This problem, like other network design problems is difficult to solve for large scale networks. In this study, a mixed-integer mathematical model that addresses the Transit Network Design Problem (TNDP) is presented. The objective function of the model is maximization of trip coverage. To solve the model, an algorithm is proposed and implemented in C# environment. The main modules of the algorithm are the following: (1) routes generation, (2) search tree, (3) solution evaluation, and (4) inference. In Route Generation module, the candidate transit route set is determined. Afterwards, the Search Tree module provides a strategy which guarantees that all feasible combinations can be considered in the search process. To evaluate the performance of each transit route combination, a transit assignment algorithm is used in the Solution Evaluation part. Finally, the intelligence core of the search process, that is called Inference, helps the algorithm to find parts of the search space which cannot contain the optimal solution. The algorithm is tested on a real size network, i.e., the extension of the Greater Isfahan rapid transit network with BRT routes. The output of the algorithm is the set of BRT routes that maximizes the daily trip coverage index while satisfying the budget constraint. By solving the case study problem, it is shown that our proposed model and algorithm are capable of tackling real size rapid transit network design problems.


2019 ◽  
Vol 10 (2) ◽  
pp. 66
Author(s):  
M. Benhayoun ◽  
M.S. Che Rusuli ◽  
A.K. Suhaila ◽  
M. Hakim ◽  
R. Ashlyzan ◽  
...  

This paper scrutinize the crucial problems such as insufficient parking space, road design, behavior of parking and peak time parking as a major factor that contribute to the improperness of car parking management. This study involves 250 respondents which took place at Pengkalan Chepa neighborhood. The sample adopts convenient sampling methods. Furthermore, this study promotes the idea to solve the incapacity of parking facilities around Pengkalan Chepa. As the result, several solutions were proposed to both university members and local community and authority to look further in this matter.


2004 ◽  
Author(s):  
Jeff Johnson ◽  
Talya N. Bauer ◽  
Leslie B. Hammer ◽  
Donald M. Truxillo

2010 ◽  
Vol 13 (4) ◽  
pp. 91-98
Author(s):  
Tuan Dinh Phan ◽  
Binh Thien Nguyen ◽  
Dien Khanh Le ◽  
Phuong Hoang Pham

The paper presents an application the research results previously done by group on the influence of technological parameters to the deformation angle and finish surface quality in order to choose technology parameters for the incremental sheet forming (ISF) process to produce products for the purpose of rapid prototyping or single-batch production, including all steps from design and process 3D CAD model, calculate and select the technological parameters, setting up manufacturing and the stage of post-processing. The samples formed successfully showed high applicability of this technology to practical work, the complex products with the real size can be produced in industries: automotive, motorcycle, civil...


2003 ◽  
pp. 61-75
Author(s):  
V. Guelbras

The article is devoted to verification of the Chinese GDP data. The author compares the rates of GDP growth with the rates of growth of energy consumption, transport turnover of goods, and numbers of projected and constructed objects in 1980-2000. The former was significantly lower during that period. He also analyses the level of using productive capacities and the quality of production. About 25-30% of industrial productive capacities are not used because there is neither national nor international demand for their low quality goods. The main conclusion of the article is that the Chinese GDP real size is about 20-30% less than official releases.


2003 ◽  
pp. 31-40
Author(s):  
N. Fedorenko ◽  
V. Simchera

The authors are of the opinion that in order to answer the question of Russia's resource potential utilization it is necessary to measure national resources, estimate their real size, the degree of their assimilation and effectiveness. Coefficients of resource potential assimilation are considered, which suggest not only its low level but also the absence of corresponding demand. For making specific decisions aimed at increasing the level of resources utilization the authors propose a number of measures.