Joint Pricing and Inventory Control Modeling for Obsolescent Products: a Case Study of Telecom Industry

2019 ◽  
Vol 12 (1) ◽  
pp. 1
Author(s):  
Isa Nakhai Kamalabadi ◽  
Bahareh Karbasian ◽  
M. Sadeghi Moghadam
2019 ◽  
Vol 12 (4) ◽  
pp. 375
Author(s):  
Mohammad Reza Sadeghi Moghadam ◽  
Isa Nakhai Kamalabadi ◽  
Bahareh Karbasian

2020 ◽  
Vol 1569 ◽  
pp. 032005
Author(s):  
Y Ngatilah ◽  
N Rahmawati ◽  
C Pujiastuti ◽  
I Porwati ◽  
A Y Hutagalung

2018 ◽  
Vol 7 (3.4) ◽  
pp. 181
Author(s):  
Hong Wai Tan ◽  
Khairur Rijal Jamaludin ◽  
H S Hamzah

Increasing the rate of converting raw material into finished product and delivering it on time is a main driver for each manufacturing industry to achieve continuous improvement in its business operation.  This case study demonstrates the improvement of the work-in-progress inventory in a non-lean company seeking to adopt lean management.  Introducing the value stream mapping (VSM) lean technique to identify the waste in the current production operation. A selection of lean tools such as Kanban card, supermarket racking and one-piece flow are applied to control and monitor the WIP inventory after justification of the factors (process cycle time, production facilities layout and facilities capacity allocation) that influence the change from the current production operation situation.The construction of the current VSM had identified the major waste in WIP inventory handling in the final fabrication process.  The fluctuation of WIP inventory has been resolved by the implementation of supermarket racking; therefore, an improvement base for WIP inventory control has been established.  Throughout this study, the lean management concept had been fostered into the production floor team and will continue developing to the organization. 


Sign in / Sign up

Export Citation Format

Share Document