Unrelated Parallel Dedicated Machine Scheduling with Sequence Dependent Set-Up Times: An Application in a Textile Company
2022 ◽
Vol 1
(1)
◽
pp. 1
2000 ◽
Vol 38
(10)
◽
pp. 2233-2252
◽
Keyword(s):
2018 ◽
Vol 145
◽
pp. 236-249
◽
2002 ◽
Vol 19
(11)
◽
pp. 859-866
◽
Keyword(s):
Keyword(s):
1996 ◽
Vol 47
(1)
◽
pp. 175
◽
Keyword(s):
2014 ◽
Vol 1046
◽
pp. 508-511
2022 ◽
Vol 16
(1)
◽
pp. 40
Keyword(s):
2007 ◽
Vol 102
(1)
◽
pp. 22-26
◽