Effective Implementation of Mitigation Measures against Voltage Collapse in Distribution Power Systems

2021 ◽  
Vol 1 (10) ◽  
pp. 67-70
Author(s):  
Ayodeji SALAU
2019 ◽  
Vol 14 (1) ◽  
pp. 5-11
Author(s):  
S. Rajasekaran ◽  
S. Muralidharan

Background: Increasing power demand forces the power systems to operate at their maximum operating conditions. This leads the power system into voltage instability and causes voltage collapse. To avoid this problem, FACTS devices have been used in power systems to increase system stability with much reduced economical ratings. To achieve this, the FACTS devices must be placed in exact location. This paper presents Firefly Algorithm (FA) based optimization method to locate these devices of exact rating and least cost in the transmission system. Methods: Thyristor Controlled Series Capacitor (TCSC) and Static Var Compensator (SVC) are the FACTS devices used in the proposed methodology to enhance the voltage stability of power systems. Considering two objectives of enhancing the voltage stability of the transmission system and minimizing the cost of the FACTS devices, the optimal ratings and cost were identified for the devices under consideration using Firefly algorithm as an optimization tool. Also, a model study had been done with four different cases such as normal case, line outage case, generator outage case and overloading case (140%) for IEEE 14,30,57 and 118 bus systems. Results: The optimal locations to install SVC and TCSC in IEEE 14, 30, 57 and 118 bus systems were evaluated with minimal L-indices and cost using the proposed Firefly algorithm. From the results, it could be inferred that the cost of installing TCSC in IEEE bus system is slightly higher than SVC.For showing the superiority of Firefly algorithm, the results were compared with the already published research finding where this problem was solved using Genetic algorithm and Particle Swarm Optimization. It was revealed that the proposed firefly algorithm gives better optimum solution in minimizing the L-index values for IEEE 30 Bus system. Conclusion: The optimal placement, rating and cost of installation of TCSC and SVC in standard IEEE bus systems which enhanced the voltage stability were evaluated in this work. The need of the FACTS devices was also tested during the abnormal cases such as line outage case, generator outage case and overloading case (140%) with the proposed Firefly algorithm. Outputs reveal that the recognized placement of SVC and TCSC reduces the probability of voltage collapse and cost of the devices in the transmission lines. The capability of Firefly algorithm was also ensured by comparing its results with the results of other algorithms.


Author(s):  
Zaid Garcia Sanchez ◽  
Jose Antonio González ◽  
Gustavo Crespo ◽  
Hernan Hernandez Herrera ◽  
Jorge Iván Silva

<span lang="EN-US">Voltage Stability has emerged in recent decades as one of the most common phenomena, occurrence in Electrical Power Systems. Prior researches focused on the development of algorithm indices to solve the stability problem and in the determination of factors with most influence in voltage collapse to solve the stability problem. This paper evaluates the influence that the load dependence has with the voltage on the phenomenon of the voltage stability and especially on the characteristics the collapse point or instability point. Load modeling used is detailed and comparisons of the results obtained are made with those described in the bibliography and those obtained with commercial software. The results of the load margin are also compared when a constant load or a voltage-dependent load is considered as well as the values obtained at the maximum load point and the point of voltage instability.</span>


2012 ◽  
Vol 3 (2) ◽  
pp. 147-156 ◽  
Author(s):  
R. A. El-Sehiemy ◽  
A. A. A. El Ela ◽  
A. M. M. Kinawy ◽  
M. T. Mouwafia

Abstract This paper presents optimal preventive control actions using ant colony optimization (ACO) algorithm to mitigate the occurrence of voltage collapse in stressed power systems. The proposed objective functions are: minimizing the transmission line losses as optimal reactive power dispatch (ORPD) problem, maximizing the preventive control actions by minimizing the voltage deviation of load buses with respect to the specified bus voltages and minimizing the reactive power generation at generation buses based on control variables under voltage collapse, control and dependent variable constraints using proposed sensitivity parameters of reactive power that dependent on a modification of Fast Decoupled Power Flow (FDPF) model. The proposed preventive actions are checked for different emergency conditions while all system constraints are kept within their permissible limits. The ACO algorithm has been applied to IEEE standard 30-bus test system. The results show the capability of the proposed ACO algorithm for preparing the maximal preventive control actions to remove different emergency effects.


1999 ◽  
Vol 32 (2) ◽  
pp. 7312-7315
Author(s):  
Mevludin Glavic ◽  
Naser Prljaca ◽  
Izudin Dzafic ◽  
Seudin Kasumovic

Author(s):  
H.-D. Chiang ◽  
I. Dobson ◽  
R.J. Thomas ◽  
J.S. Thorp ◽  
L. Fekih-Ahmed

Sign in / Sign up

Export Citation Format

Share Document