scholarly journals Analysis of Adverse Selection for Motivation Mechanism in Engineering Project Cost Management

2013 ◽  
Vol 5 (14) ◽  
pp. 3777-3782
Author(s):  
Lin Yiyong ◽  
Wang Yousong ◽  
Liu Jingkuang
2013 ◽  
Vol 448-453 ◽  
pp. 4207-4210
Author(s):  
Dai Xu Li

Resource Consumption Accounting (RCA) is the theory innovation of management accounting. Taking the resources as the junction, It perfectly unifies Activity-Based Costing (ABC) and Grenzplankostenrechnung (GPK). The author will attempt to use the idea of RCA in project cost management in this thesis.


2013 ◽  
Vol 357-360 ◽  
pp. 2610-2613
Author(s):  
Wen Qiong Li ◽  
Fei Li ◽  
Yue Xiang Yang

In recent years, construction industry develops rapidly with infrastructure investment continuing to increase. Project cost management is demanded increasingly in engineering project management, and cost forecast is a vital part that enterprise strengthen overall cost management and play an important role in engineering project management increasingly. This paper uses single regression method to forecast engineering project cost, in order to make project cost management more scientific and effective.


2011 ◽  
Vol 94-96 ◽  
pp. 2238-2242
Author(s):  
Yan Qun Tang ◽  
Wei Zeng

Basing on the analysis of problems existing in the comprehensive decision-making and balanced optimizing of project programs, the writer has introduced the method of physical planning to solve the problems of comprehensive decision-making and optimizing in the quality of the project management – time limit for a project - cost, and established the quality - time limit for a project- cost comprehensive evaluation and decision model as well as the quality - time limit for a project - cost optimization model. The proposed method has been proved effective through the cases of highway engineering project management.


2014 ◽  
Vol 687-691 ◽  
pp. 1979-1982
Author(s):  
Chun Jin ◽  
Yun Bai

At present, the application of project cost management information system has become a trend. The development of project cost management information system in our country is relatively later. Because project cost management information system is lack of unified network, imperfect system module, lower personal qualities, and so on, it does not play proper role. The article analyzes construction of project cost management information system from overall design and puts forward the corresponding countermeasures and suggestions.


Sign in / Sign up

Export Citation Format

Share Document