Unique Approach for Subsea Pipeline Design Challenges in Abu Dhabi Shallow Waters

2016 ◽  
Author(s):  
Rajendran Selvam ◽  
Hussain A. Binthabet ◽  
Salah Jebara al Bufalah ◽  
Najem A. Qambar ◽  
Amr M. Azouz
Author(s):  
Dale Millward

Effective pipeline design and regular maintenance can assist in prolonging the lifespan of subsea pipelines, however the presence of marine vessels can significantly increase the risk of pipeline damage from anchor hazards. As noted in the Health and Safety Executive – Guideline for Pipeline Operators on Pipeline Anchor Hazards 2009. “Anchor hazards can pose a significant threat to pipeline integrity. The consequences of damage to a pipeline could include loss of life, injury, fire, explosion, loss of buoyancy around a vessel and major pollution”. This paper will describe state of the art pipeline isolation tooling that enables safe modification of pressurised subsea pipelines. Double Block and Bleed (DBB) isolation tools have been utilised to greatly reduce downtime, increase safety and maximise unplanned maintenance, providing cost-effective solutions to the end user. High integrity isolation methods, in compliance with international subsea system intervention and isolation guidelines (IMCA D 044 / IMCA D 006), that enable piggable and unpiggable pipeline systems to be isolated before any breaking of containment, will also be explained. This paper will discuss subsea pipeline damage scenarios and repair options available to ensure a safe isolation of the pipeline and contents in the event of an incident DNV GL type approved isolation technology enables the installation of a fail-safe, DBB isolation in the event of a midline defect. The paper will conclude with case studies highlighting challenging subsea pipeline repair scenarios successfully executed, without depressurising the entire pipeline system, and in some cases without shutting down or interrupting production.


2017 ◽  
Vol 07 (02) ◽  
pp. 311-323
Author(s):  
Son Tung Pham ◽  
Minh Huy Truong ◽  
Ba Tuan Pham

2020 ◽  
Author(s):  
A. Almessabi ◽  
G. Cambois ◽  
M. Mahgoub ◽  
J. Oukili ◽  
S. Naumann ◽  
...  
Keyword(s):  

2021 ◽  
Author(s):  
Oleg Khakimov ◽  
Yaser Gholami ◽  
Bertrand Tertrais ◽  
Guillaume Cambois ◽  
Mohamed Mahgoub

Abstract Seismic surveys are generally designed to image deep reservoirs, which leaves the near-surface woefully under-sampled. This is particularly a challenge offshore Abu Dhabi, where a complex near-surface – with karstic collapses and meandering channels – contaminates the seismic image with strong footprints. To mitigate these effects, we use near-field hydrophone data, primarily designed to QC the airgun source, for near-surface imaging. Near-field hydrophones (NFH) are positioned about a meter above each airgun and are designed to record the source near-field pressure. They immediately capture dysfunctional or out-of-spec guns, which alerts the recording crew. Yet, in a shallow water environment, they unintentionally record seismic reflections from the near-surface, which we will use for seismic imaging. Streamer vessels usually use two source arrays, 50 meters apart, which shoot in a flip-flop mode. The active NFH refer to the recordings directly above the shooting guns, while the passive NFH refer to the recordings from the array that is not shooting. Because the passive NFH are less contaminated by the source near-field, they are typically the preferred choice for near-surface imaging. Waters are too shallow in offshore Abu Dhabi to use streamer vessels. Instead, seismic surveys involve ocean-bottom cables (OBC) or nodes (OBN) and smaller airgun arrays. The shooting vessels can be single-source or dual-source. While a single source vessel has only active NFH, a dual source vessel has both active and passive NFH. However, even if a dual-source vessel is used, the 50 m distance between the shooting source array and the passive NFH is too large to capture the water-bottom reflection for water-depths shallower than 25 m. For these reasons, we propose to combine both measurements, using active NFH for the very shallow section and passive NFH for the deeper section. We have applied this technique to a recent node survey acquired offshore Abu Dhabi. By combining the active and passive NFH, a very high-resolution shallow image was obtained, which allows the interpretation of geological layers just below the water bottom. Comparisons with high resolution 2D site survey images show good agreement. Given the NFH do not require any additional acquisition and are delivered as a byproduct of standard seismic surveys, we have demonstrated that proper use of NFH can provide high quality images for pre-site survey interpretation, which reduces the need for additional – and expensive – geotechnical surveys. This is the first published use of combined active and passive NFH in Abu Dhabi shallow waters for the purpose of imaging. The resolution of the shallow formation images allows detailed interpretation not achievable using conventional seismic data. In the long term, this technique may reduce the need for additional site survey acquisitions.


2019 ◽  
Vol 19 (1) ◽  
pp. 72-85
Author(s):  
S. A. Marfo ◽  
P. Opoku Appau ◽  
J. Acquah ◽  
E. M. Amarfio

The increasing exploration and production activities in the offshore Cape Three Point Blocks of Ghana have led to the discovery and development of gas condensate fields in addition to the oil fields which produce significant amount of condensate gas. These discoveries require pipelines to transport the fluids avoiding hydrates and wax formation. This paper focuses on subsea pipeline design using Pipesim software that addresses flow assurance problems associated with transporting condensate gas from the Jubilee and TEN Fields to the Atuabo Gas Processing Plant. It also considered an alternate design that eliminates the need for capacity increase of flowlines for the futuristic highest projected flow rates in 2030. The design comprises of two risers and two flowlines. Hydrate formation temperature was determined to be 72.5 ˚F at a pressure of 3 000 psig. The insulation thickness for flowlines 1 and 2 were determined to be 1.5 in. and 2 in. respectively. The pipe size for flowlines 1 and 2 were determined to be 12 in. and 14 in. respectively. The maximum designed flow rate was determined to be 150 MMSCFD. To meet the highest projected flow rate of 700 MMSCFD in the year 2030 at the processing plant, a 16 in. ID pipeline of 44 km length was placed parallel to the 12 in. ID flowline 1. This parallel pipeline increased the designed flow rate by approximately 4.7 times (705 MMSCFD). The alternate design employs 18 in. and 20 in. ID pipes for flowlines 1 and 2 respectively. Keywords: Condensate Gas; Flowline; Flow Assurance; Hydrate; Pipesim


2019 ◽  
Author(s):  
Subrata Bhowmik ◽  
Gautier Noiray ◽  
Harit Naik

2018 ◽  
Author(s):  
A. Laye ◽  
K. Victoire ◽  
V. Cocault-Duverger

Author(s):  
Sikder Hasan ◽  
Lily Sweet ◽  
Jason Hults ◽  
Genebelin Valbuena ◽  
Binder Singh

Sign in / Sign up

Export Citation Format

Share Document