SOLAG: An Intelligent Gas Lift Optimization System for Continuous and Intermittent Gas Lift Wells

1994 ◽  
Author(s):  
M. Cedeno ◽  
J.L. Ortiz
Keyword(s):  
Author(s):  
Matthew W. Harris ◽  
Mahsa Memarzadeh ◽  
Cassandra Swanberg ◽  
Amr El-Bakry
Keyword(s):  

2021 ◽  
Author(s):  
Zaidi Awang@Mohamed ◽  
Jagaan Selladurai ◽  
Siti Nur Mahirah Mohd Zain ◽  
Juhari Yang ◽  
Badroel Rizwan Bahar ◽  
...  

Abstract Objectives/Scope This paper describes a pilot installation of a digital intelligent artificial lift (DIAL) gas lift production optimization system. The work was inspired by PETRONAS' upstream digitalization strategy with five single and dual-string gas lift completions planned from 2018 to 2020, offshore Malaysia. The authors evaluate the impact of the DIAL system in terms of increasing production, optimizing lift-gas injection, reducing well intervention frequency, as well as OPEX and risk reduction. Methods, Procedure, Process DIAL is a unique technology that enhances the efficiency of gas lift production. Downhole monitoring of production parameters informs remote surface-controlled adjustment of gas lift valves. This enables automation of production optimization removing the need for well intervention. The paper focuses on a well installed in June 2020, the first in a five well campaign. The authors will provide details of the technology, and pilot program phases: system design; pre-job preparations; run in hole and surface hook-up; commissioning and unloading; and subsequent production operations. For each phase, challenges encountered, and lessons learned will be listed together with observed benefits. Results, Observations, Conclusions DIAL introduces a paradigm shift in the design, installation, and operation of gas lifted wells. This paper will compare the differences between this digital technology and conventional gas lift techniques. It will consider the value added from the design stage through installation operations to production optimization. The DIAL system's ability to operate at greater than 80-degree deviation enabled deeper injection while avoiding tractor interventions for GLV maintenance in the highly deviated section of the well. Built-in downhole sensors provided real-time pressure monitoring that enabled a better understanding of reservoir behaviour and triggered data-driven reservoir stimulation decisions. The technology also proved very beneficial for production optimization, with the intervention-less adjustment of gas injection rate and depth downhole, based on the observed reservoir response in real time. The variable port sizes can be manipulated by means of surface switch/control. Overcoming the completion challenges due to COVID-19 restrictions, the well was unloaded and brought online with the assistance of personnel located in Houston and Dubai using Silverwell's visualization software. The well continues to be remotely monitored and controlled ensuring continuous production optimization, part of PETRONAS' upstream digitization strategic vision. Novel/Additive Information First deployment worldwide of new and unique gas lift production optimization technology in offshore highly deviated well. The technology deployment was the result of collaborative work between a multi-discipline engineering team in PETRONAS, Silverwell, and Neural Oilfield Service.


2021 ◽  
Author(s):  
M Haziq M Ghazali ◽  
M Rizwan Rozlan ◽  
M Farris Bakar ◽  
M Faizatulizuddin Ishak ◽  
Orient Balbir Samuel ◽  
...  

Abstract PETRONAS completed well H-X on B field in Malaysia with a digital intelligent artificial lift (DIAL) gas lift production optimization system. This DIAL installation represents the first ever successful installation of the technology in an Offshore well for Dual String production. This paper provides complete details of the installation planning and operational process undertaken to achieve this milestone. DIAL is a unique technology that enhances the efficiency of gas lift production. Downhole monitoring of production parameters informs remote surface-controlled adjustment of gas lift valves. This enables automation of production optimization removing the need for well intervention. This paper focusses on a well completed in November 2020, the fourth well to be installed with the DIAL technology across PETRONAS Assets. The authors will provide details of the well and the installation phases: system design, pre-job preparations, improvements implementation, run in hole and surface hook-up. For each phase, challenges encountered, and lessons learned will be listed together with observed benefits. DIAL introduces a paradigm shift in design, installation and operation of gas lifted wells. This paper will briefly highlight the justifications of this digital technology in comparison with conventional gas lift techniques. It will consider value added from the design stage, through installation operations, to production optimization. This DIAL system installation confirms the ability to be implement the technology in a challenging dual string completion design to enable deeper injection while avoiding interventions on a well with a greater than 60-degree deviation. With remotely operated, non-pressure dependent multi-valve in-well gas lift units, the technology removes the challenges normally associated with gas-injected production operation in a dual completion well – gas robbing and multi-pointing. Despite the additional operational & planning complications due to COVID-19 restrictions, the well was completed with zero NPT and LTI. Once brought online, this DIAL-assisted production well will be remotely monitored and controlled ensuring continuous production optimization, part of PETRONAS’ upstream digitization strategic vision.


2006 ◽  
Vol 103 (2) ◽  
pp. 76-81
Author(s):  
C. Perin Filho ◽  
D. Tassinari Miranda ◽  
E. Medeiros Milanez ◽  
E. Luiz Massanori Harano ◽  
E. Torres Bispo dos Santos ◽  
...  

1992 ◽  
Vol 47 (4) ◽  
pp. 525-536
Author(s):  
L. Caralp ◽  
G. Defaye ◽  
C. Vidal
Keyword(s):  

2018 ◽  
Author(s):  
Plathey Plathey
Keyword(s):  

Sign in / Sign up

Export Citation Format

Share Document