Repair of an Openhole Gravel Pack Using Coiled Tubing

2003 ◽  
Author(s):  
Monica Ovesen ◽  
Mai Riise ◽  
Siv Arna Tanem ◽  
Kjell Tore Nesvik
Keyword(s):  
2021 ◽  
Author(s):  
Seng Wei Jong ◽  
Yee Tzen Yong ◽  
Yusri Azizan ◽  
Richard Hampson ◽  
Rudzaifi Adizamri Hj Abd Rani ◽  
...  

Abstract Production decline caused by sand ingress was observed on 2 offshore oil wells in Brunei waters. Both wells were completed with a sub-horizontal openhole gravel pack and were subsequently shut in as the produced sand would likely cause damage to the surface facilities. In an offshore environment with limited workspace, crane capacity and wells with low reservoir pressures, it was decided to intervene the wells using a catenary coiled tubing (CT) vessel. The intervention required was to clean out the sand build up in the wells and install thru-tubing (TT) sand screens along the entire gravel packed screen section. Nitrified clean out was necessary due to low reservoir pressures while using a specialized jetting nozzle to optimize turbulence and lift along the deviated section. In addition, a knockout pot was utilized to filter and accommodate the large quantity of sand returned. The long sections of screens required could not be accommodated inside the PCE stack resulting in the need for the operation to be conducted as an open hole deployment using nippleless plug and fluid weight as well control barrier. A portable modular crane was also installed to assist the deployment of long screen sections prior to RIH with CT. Further challenges that needed to be addressed were the emergency measures. As the operation was to be conducted using the catenary system, the requirement for an emergency disconnect between the vessel and platform during the long cleanout operations and open hole deployment needed to be considered as a necessary contingency. Additional shear seal BOPs, and emergency deployment bars were also prepared to ensure that the operation could be conducted safely and successfully.


2007 ◽  
Author(s):  
Philip Johan Bogaert ◽  
Gustavo Dario Cavazzoli ◽  
Daniel Rafael Perez ◽  
Bernhard R. Lungwitz ◽  
Cesar Roberto Guimaraes De Carvalho ◽  
...  

1996 ◽  
Author(s):  
Zdenek Sehnal ◽  
Knut Ostvang ◽  
Lasse Hermansson ◽  
Mike Sanders ◽  
Arie-Jan de Haas
Keyword(s):  

2021 ◽  
Author(s):  
Wiwat Wiwatanapataphee ◽  
Thanita Kiatrabile ◽  
Pipat Lilaprathuang ◽  
Noppanan Nopsiri ◽  
Panyawadee Kritsanamontri

Abstract The conventional gravel pack sand control completion (High Rate Water Pack / Extension Pack) was the primary sand control method for PTTEPI, Myanmar Zawtika field since 2014 for more than 80 wells. Although the completion cost of gravel pack sand control was dramatically reduced around 75 percent due to the operation performance improvement along 5 years, the further cost reduction still mandatory to make the future development phase feasible. In order to tackle the well economy challenge, several alternative sand control completion designs were reviewed with the existing Zawtika subsurface information. The Chemical Sand Consolidation (CSC) or resin which is cost-effective method to control the sand production with injected chemicals is selected to be tested in 3 candidate wells. Therefore, the first trial campaign of CSC was performed with the Coiled Tubing Unit (CTU) in March to May 2019 with positive campaign results. The operation program and lesson learned were captured in this paper for future improvement in term of well candidate selection, operation planning and execution. The three monobore completion wells were treated with the CSC. The results positively showed that the higher sand-free rates can be achieved. The operation steps consist of 1) Perform sand cleanout to existing perforation interval or perforate the new formation interval. 2) Pumping pre-flush chemical to conditioning the formation to accept the resin 3) Pumping resin to coating on formation grain sand 4) Pumping the post-flush chemical to remove an excess resin from sand 5) Shut in the well to wait for resin curing before open back to production. However, throughout the campaign, there were several lessons learned, which will be required for future cost and time optimization. In operational view, the proper candidate selection shall avoid operational difficulties e.g. available rathole. As well, detailed operation plan and job design will result in effective CSC jobs. For instance, the coil tubing packer is suggested for better resin placement in the formation. Moreover, accommodation arrangement (either barge or additional vessel) and logistics management still have room for improvement. These 3 wells are the evidences of the successful applications in Zawtika field. With good planning, lesson learned and further optimization, this CSC method can be beneficial for existing monobore wells, which required sand control and also will be the alternative sand control method for upcoming development phases. This CSC will be able to increase project economic and also unlock the marginal reservoirs those will not justify the higher cost of conventional gravel pack.


2007 ◽  
Author(s):  
Jennifer Yvonne Julian ◽  
Kirk Charles Forcade ◽  
Taylor L. West ◽  
Kevin yeager ◽  
Robert Lee Mielke ◽  
...  

2016 ◽  
Author(s):  
Ali Al-Ghaithi ◽  
Fahad Alawi ◽  
Ernest Sayapov ◽  
Ehab Ibrahim ◽  
Najet Aouchar ◽  
...  

2014 ◽  
Author(s):  
M. Ababou ◽  
A. Shote ◽  
T. Sturgeon
Keyword(s):  

Author(s):  
Y. Anggoro

The Belida field is an offshore field located in Block B of Indonesia’s South Natuna Sea. This field was discovered in 1989. Both oil and gas bearing reservoirs are present in the Belida field in the Miocene Arang, Udang and Intra Barat Formations. Within the middle Arang Formation, there are three gas pay zones informally referred to as Beta, Gamma and Delta. These sand zones are thin pay zones which need to be carefully planned and economically exploited. Due to the nature of the reservoir, sand production is a challenge and requires downhole sand control. A key challenge for sand control equipment in this application is erosion resistance without inhibiting productivity as high gas rates and associated high flow velocity is expected from the zones, which is known to have caused sand control failure. To help achieve a cost-effective and easily planned deployment solution to produce hydrocarbons, a rigless deployment is the preferred method to deploy downhole sand control. PSD analysis from the reservoir zone suggested from ‘Industry Rules of Thumb’ a conventional gravel pack deployment as a means of downhole sand control. However, based on review of newer globally proven sand control technologies since adoption of these ‘Industry Rules of Thumb’, a cost-effective solution could be considered and implemented utilizing Ceramic Sand Screen technology. This paper will discuss the successful application at Block B, Natuna Sea using Ceramic Sand Screens as a rigless intervention solution addressing the erosion / hot spotting challenges in these high rate production zones. The erosion resistance of the Ceramic Sand Screen design allows a deployment methodology directly adjacent to the perforated interval to resist against premature loss of sand control. The robust ceramic screen design gave the flexibility required to develop a cost-effective lower completion deployment methodology both from a challenging make up in the well due to a restrictive lubricator length to the tractor conveyancing in the well to land out at the desired set depth covering the producing zone. The paper will overview the success of multi-service and product supply co-operation adopting technology enablers to challenge ‘Industry Rules of Thumb’ replaced by rigless reasoning as a standard well intervention downhole sand control solution where Medco E&P Natuna Ltd. (Medco E&P) faces sand control challenges in their high deviation, sidetracked well stock. The paper draws final attention to the hydrocarbon performance gain resulting due to the ability for choke free production to allow drawing down the well at higher rates than initially expected from this zone.


Sign in / Sign up

Export Citation Format

Share Document