scholarly journals INFLUENCE OF THE RESERVOIR SEDIMENTATION ON THE DAM OPERATION – A STUDY OF ASWAN HIGH DAM IN EGYPT

2020 ◽  
Vol 48 (5) ◽  
pp. 927-950
Author(s):  
Amir M. Mobasher
2013 ◽  
Vol 15 (4) ◽  
pp. 1491-1510 ◽  
Author(s):  
Noha Donia

The Aswan High Dam Reservoir management system was developed to simulate dam operation under varying boundary conditions taking as example climate change and Millennium Dam construction, and analyze the optimal operation rules of the reservoir taking into account a large number of objectives, including hydropower production and water supply for irrigation purposes. The developed system runs on Windows platforms and comprises three basic modules: a user-friendly graphical interface managing all graphic features, a computational engine where all the algorithms are implemented, and a database and files module managing hydrological and operational data. The developed model was calibrated. The future hydrologic scenarios developed have been used to assess the expected impacts of potential climate change (baseline and three periods with two global emission scenarios) and the Millennium Dam. The new operation rules were used for scenarios analysis. It was concluded that overall applying the new operation rules will decrease the percentage of occurrence of minimum water levels. Also, the Millennium Dam will increase the percentage of occurrence of minimum water levels. Finally, the period III (2070–2099) for the two global emission scenarios is very critical for the dam operation.


2018 ◽  
Author(s):  
Sahira Monic Cancel Vázquez ◽  
◽  
Edwin Omar Irizarry Brugman ◽  
K. Stephen Hughes

Entropy ◽  
2021 ◽  
Vol 23 (3) ◽  
pp. 378
Author(s):  
Taeyong Kwon ◽  
Seongsim Yoon ◽  
Sanghoo Yoon

Uncertainty in the rainfall network can lead to mistakes in dam operation. Sudden increases in dam water levels due to rainfall uncertainty are a high disaster risk. In order to prevent these losses, it is necessary to configure an appropriate rainfall network that can effectively reflect the characteristics of the watershed. In this study, conditional entropy was used to calculate the uncertainty of the watershed using rainfall and radar data observed from 2018 to 2019 in the Goesan Dam and Hwacheon Dam watersheds. The results identified radar data suitable for the characteristics of the watershed and proposed a site for an additional rainfall gauge. It is also necessary to select the location of the additional rainfall gauged by limiting the points where smooth movement and installation, for example crossing national borders, are difficult. The proposed site emphasized accessibility and usability by leveraging road information and selecting a radar grid near the road. As a practice result, the uncertainty of precipitation in the Goesan and Hwacheon Dam watersheds could be decreased by 70.0% and 67.9%, respectively, when four and three additional gauge sites were installed without any restriction. When these were installed near to the road, with five and four additional gauge sites, the uncertainty in the Goesan Dam and Hwacheon Dam watersheds were reduced by up to 71.1%. Therefore, due to the high degree of uncertainty, it is necessary to measure precipitation. The operation of the rainfall gauge can provide a smooth site and configure an appropriate monitoring network.


Sign in / Sign up

Export Citation Format

Share Document