scholarly journals Role of Critical Success factors (CSF) in the implementation of Six Sigma in hospitals: A preliminary study in Pakistan

2020 ◽  
Vol 15 (1) ◽  
pp. 5-13
Author(s):  
Muzna Abid ◽  
Osama Majeed Butt ◽  
Quratul Ann ◽  
Bushra Rashid ◽  
Nanthini Sri Devi

Six sigma can enable us to determine the possible solutions to most of the problems which are being faced by the healthcare system of Pakistan. Six sigma is a viable way to make healthcare rapid and proficient. It is already being successfully utilized around the globe in service as well as the manufacturing sector.  This research is a preliminary study; conducted, in an attempt, to highlight the issues in healthcare like scarcity of medicines, the inefficiency of medical staff, insufficient beds and low doctor/patient ratio in hospitals of Pakistan. A proposal is proposed for a viable solution in the form of six-sigma. For this study, six-sigma identifies the potential issue by involving all employees of the targeted sectors. The collection of primary data was done from employees at quality departments in hospitals and via survey. The importance of critical success factors in the public and private hospitals of Pakistan was determined by the aforementioned survey. Critical analysis pointed out that most of the employees were unaware of the quality initiatives and six-sigma.

Author(s):  
Fernando Forcellini ◽  
Milton Pereira ◽  
Helio Aisenberg Ferenhof ◽  
Arthur Boeing Ribeiro

2014 ◽  
Vol 1 (4) ◽  
pp. 9-13 ◽  
Author(s):  
Aqeel Ahmed ◽  
Muhammad Sehail Younis

This preliminary study attempts to link among the critical success factors on overall project success in public sector organizations in Pakistan.  In this study it’s reflected that major critical success factors (soundness of Business & workforce, planning & control, quality performance and past performance) can enhance the success of the project in Pakistan.  The purpose of this preliminary study was to verify the reliability of the survey instrument which has been used in European countries. It was found that the planning & control was the highest Cronbach Alpha value, while the ranged for each constructs in the present study from 0.68 to 0.88.  Therefore, based on the Cronbach alpha value score, the proposed survey instrument has fulfilled the basic requirement of a valid instrument.


2015 ◽  
Vol 6 (4) ◽  
pp. 339-348 ◽  
Author(s):  
Fairul Anwar Abu Bakar ◽  
Khairanum Subari ◽  
Mohd Amran Mohd Daril

Purpose – The purpose of this paper is to review and gather the latest critical success factors (CSF) of Lean Six Sigma (LSS) deployment and implementation into a comprehensive list of factors. Design/methodology/approach – The approach taken by authors in this study was to analyze the latest literature review starting 2010 onwards and focus on CSFs of LSS (not dedicated as Lean or Six Sigma) by excluding other improvement methodologies or initiatives, e.g. Lean, Six Sigma, TQM, TRIZ etc. Findings – Five significant CSFs were identified (initially 97 CSFs listed from 13 papers) out of nine groups/headers listed in clustering analysis using Affinity Diagram tool and new headers mapping. Practical implications – Most of the organisations were aware of the success story on LSS, but did not scrutinize or consider its CSFs. By knowing the outcome of this paper, it can help open eyes regarding readiness before implementing LSS. Originality/value – At the end of this paper, the authors tried to cluster the CSFs similarities that could intentionally provide the guidelines and references to industries/companies for successful deployment and implementation of LSS in future endeavours.


2018 ◽  
Vol ahead-of-print (ahead-of-print) ◽  
Author(s):  
Mrigendra Nath Mishra

Purpose The purpose of this paper is analysis of Green and Lean Six Sigma, based on the success factors in its use through a well thought-out literature review, is being planned; a framework has been integrated in a productive manner with the Green and Lean and Six Sigma methods so as to incorporate and actualize the execution. Design/methodology/approach The methodology consists of comparative investigation of Green, Lean management and Six Sigma using open written work, essential analysis at data and master experience of the researchers. To achieve this goal, a significant review of the existing literature of the subject area has been done to prepare a framework in view of the critical success factors. A study was arranged and flowed survey from various businesses utilizing John’s Macintosh Project (JMP) statistical software. Findings The paper establishes the distinguishing proof of five success factors with their situational importance and shows that the integrated Green and Lean Six Sigma can drive the organizations to optimize their resources and cost of services or productions. Practical implications A Green and Lean Six Sigma organization would take profits by the use of the proposed framework in an alternate extent of organizations should be dynamic. The organizations should assess their shortcomings and qualities, set needs and perceive objectives for fruitful implementation. Originality/value Suggestions are being made regarding thoughts and methods that would constitute a Green and Lean Six Sigma organization. The suggested framework compare the method for improvements that may occur in organizations while implementation of the Green and Lean management or Six Sigma.


2008 ◽  
Vol 9 (2) ◽  
pp. 39-56 ◽  
Author(s):  
Ma Yi‐zhong ◽  
Yue Gang ◽  
Wang Li‐lin ◽  
Sangbok Ree

2017 ◽  
Vol 48 (4) ◽  
pp. 93-106 ◽  
Author(s):  
Khalid Almarri ◽  
Halim Boussabaine

Governments are increasingly entering partnerships with the private sector through the public–private partnership (PPP) model for the development of public projects. Value for money analysis is used to assess the viability of these ventures. This research aims to investigate the contribution of the PPP critical success factors to value for money viability analysis. Relevant data were collected through a questionnaire to establish the PPP critical success factors and value for money success criteria. Data were collected from 92 participants. The data obtained were analyzed using mean score, t-test, and regression analysis. The research found that government guarantees, macroeconomic conditions, shared authority between the public and private sectors, social support, and transparent procurement process contributed positively to value for money viability analysis. The results imply that practitioners should consider these key indicators for improving the value for money viability of PPP projects.


Sign in / Sign up

Export Citation Format

Share Document