Abstract The article presents the current state of knowledge in the field of estimating preliminary values of storm water subcatchment calibration parameters in the case of using the Storm Water Management Model (SWMM) for building a model of storm water drainage system. The key issue is estimating the runoff width in the case of reducing the network structure and storm water catchments due to the shortening of calculation time and simplification of the model calibration process. Correction of one of the recommended literature methods has been proposed. The assessment was based on the real catchment model with single and multi-family housing. It was found possible to apply the proposed method in the case of reducing systems connected in series.

2015 ◽  
Vol 744-746 ◽  
pp. 1146-1150
Author(s):  
Zheng Rong Fu ◽  
Jia Xin Zhuang ◽  
Liang Zhu Wang

The drainage system of a part of a university campus was tapped using SWMM (Storm Water Management Model). Local drainage discharge capacity was studied under different design storm return period. Results show that flooding and overload at some junctions and in some conduits are doubled with the increase of design rain return period from one year to five year, which may deteriorate the traffic and road base.


2018 ◽  
Vol 44 ◽  
pp. 00129
Author(s):  
Monika Nowakowska

In the paper were made the verification of the operation of a rainwater drainage system in the residential communities of Gaj and Tarnogaj in Wrocław, carried out in the hydrodynamic model using SWMM software. There were used two criterial precipitation: Euler’s model (with a frequency of C = 3 years) and the actual precipitation (C = 5 years). The criteria of overloading the system was the specific flood volume (SFV). For both cases of precipitation load of catchment, the simulated calculations showed the occurrence of outflows from the channels. Due to the value of SFV indicator (respectively: 19 m3/ha and 42,9 m3/ha), it was found that the tested system needs modernization, therefor acceptable instantaneous water level above the maximum water impoundment were more often than 1 per 3 years, which leads to overflows from channels for residential areas more often than allowed once every 20 years.


Author(s):  
Vidyapriya V. ◽  
Ramalingam M.

Mostly populous city like Chennai is subjected to frequent flooding due to its complex nature of natural and man-made activities. From the analysis of the past records of flood events of 1943,1976,1985,2005 and 2008,it has been observed Adayar watershed is subjected to cataclysmic flooding in low-lying areas of the city and its suburbs because of inoperativeness of the local drainage system, rainfall associated with cyclonic activity, topography of the terrain, encroachments along the floodplain, hugh upstream flow discharge into the river and the highly impervious area which blocked the runoff to flow into the storm water drainage. After looking into these problems of flooding, a study have been conducted on Adayar watershed to develop a 2D hydrodynamic model for the two scenarios of existing condition of storm water drainage network and revised conditions of storm water drainage network using high resolution Lidar DEM to assess the volume of runoff with respect to time and duration on flood peaks for the two flood events of 2005 and 2015.Secondly to develop a 1D flood model to predict the river stages during peak floods using MIKE 11 for the Adayar watershed. Thirdly to integrate the coupled 1D and 2D model using MIKEFLOOD for assessing the extent of inundation in the floodplain area of Adayar river. Finally results from the integrated model have been validated and the results found satisfactory. As a part of mitigation measures, two flood mitigation measures have been adopted. One measure such as revised storm water drainage system which enhances the flood carrying capacity of the drains and results in less inundated area which solves the problem of urban flooding and second measure such as regrading the river bed which reduces the floodplain inundation around the adjacent area of the river. After adopting these measures, the river is free to flow into the sea without any blockades.