scholarly journals Implementation Factors and Community Project Performance In Rwanda: A Case Of Water Aid Rwanda Project (Warp) In Gahanga Sector

Author(s):  
Christella GIRIZINA RUGABIRA ◽  
Dr. Eugenia Nkechi Irechukwu
MIS Quarterly ◽  
2015 ◽  
Vol 39 (4) ◽  
pp. 787-807 ◽  
Author(s):  
Narayan Ramasubbu ◽  
◽  
Anandhi Bharadwaj ◽  
Giri Kumar Tayi ◽  
◽  
...  

2021 ◽  
Vol 11 (4) ◽  
pp. 1660 ◽  
Author(s):  
Ivan Marović ◽  
Monika Perić ◽  
Tomaš Hanak

A way to minimize uncertainty and achieve the best possible project performance in construction project management can be achieved during the procurement process, which involves selecting an optimal contractor according to “the most economically advantageous tender.” As resources are limited, decision-makers are often pulled apart by conflicting demands coming from various stakeholders. The challenge of addressing them at the same time can be modelled as a multi-criteria decision-making problem. The aim of this paper is to show that the analytic hierarchy process (AHP) together with PROMETHEE could cope with such a problem. As a result of their synergy, a decision support concept for selecting the optimal contractor (DSC-CONT) is proposed that: (a) allows the incorporation of opposing stakeholders’ demands; (b) increases the transparency of decision-making and the consistency of the decision-making process; (c) enhances the legitimacy of the final outcome; and (d) is a scientific approach with great potential for application to similar decision-making problems where sustainable decisions are needed.


2021 ◽  
pp. 113669
Author(s):  
Luca Berardi ◽  
Kevin D. Haggerty ◽  
Sandra Bucerius ◽  
Harvey Krahn

Sign in / Sign up

Export Citation Format

Share Document