Applying artificial neural networks to top-down construction cost estimating of highway projects at the conceptual stage
Keyword(s):
Top Down
◽
2017 ◽
Vol 14
(4)
◽
pp. 747-756
◽
Keyword(s):
2012 ◽
Vol 30
(4)
◽
pp. 470-478
◽
2018 ◽
Vol 0
(106)
◽
pp. 52-57
Keyword(s):
2018 ◽
pp. 283-289
◽
Keyword(s):
2005 ◽
Vol 147
(a2)
◽
pp. 15
Keyword(s):
1999 ◽
Vol 22
(8)
◽
pp. 723-728
◽