Environmental Constraints on Hydropower: An Ex Post Benefit-Cost Analysis of Dam Relicensing in Michigan

2006 ◽  
Vol 82 (3) ◽  
pp. 384-403 ◽  
Author(s):  
M. J. Kotchen ◽  
M. R. Moore ◽  
F. Lupi ◽  
E. S. Rutherford
2014 ◽  
Vol 5 (2) ◽  
pp. 285-314 ◽  
Author(s):  
Elizabeth Kopits

Abstract:While the need to update EPA benefit-cost analysis to reflect the most recent science is broadly acknowledged, little work has been done examining how well ex ante BCAs estimate the actual benefits and costs of regulations. This paper adds to the existing literature on ex post cost analyses by examining EPA’s analysis of the 1998 Locomotive Emission Standards. Due to data limitations and minimal ability to construct a reasonable counterfactual for each component of the cost analysis, the assessment relies mainly on industry expert opinion, augmented with ex post information from publicly available data sources when possible. The paper finds that the total cost of bringing line-haul locomotives into compliance with the 1998 Locomotive Emission Standards rule remains uncertain. Even though the initial per-unit locomotive compliance costs were higher than predicted by EPA, total costs also depend on the number of locomotives affected by the regulation. Over 2000–2009, the number of newly built line-haul locomotives was higher but the number of remanufactured line-haul locomotives was lower than EPA’s estimate.


2019 ◽  
Vol 11 (1) ◽  
pp. 76-100
Author(s):  
Allen Bellas ◽  
Lea Kosnik

AbstractIn 1992, Congress passed The Elwha River Ecosystem and Fisheries Restoration Act with the goal of “full restoration of The Elwha River Ecosystem and native anadromous fisheries.” As part of that act, the federal government was required to produce a benefit-cost analysis on dam removal of the Elwha and Glines Canyon dams, which was published in 1994. This article revisits that initial 1994 benefit-cost analysis; background on its methods and assumptions is given, comparisons are made to current state-of-the-art techniques in benefit-cost analysis, and an ex post benefit-cost analysis of the project is conducted for comparison purposes. We find that the cost and scope of the project exceeded original expectations, the cost of the foregone electricity generation was less than expected, and that anticipated recreational and fisheries benefits were both delayed, and lower, than expected. Furthermore, issues such as the value of hatchery-spawned versus wild anadromous fish seem not to have been anticipated in the original analysis, highlighting the fact that in doing an ex ante analysis, researchers must expect that unexpected factors may influence the ex post results of any project.


1988 ◽  
Vol 24 (8) ◽  
pp. 1397-1405 ◽  
Author(s):  
Jorge Ramirez ◽  
Wiktor L. Adamowicz ◽  
K. William Easter ◽  
Theodore Graham-Tomasi