One hundred typical mistakes and violations of biotechnics of artificial breeding of Pacific salmon

Fisheries ◽  
2021 ◽  
Vol 2021 (5) ◽  
pp. 80-88
Author(s):  
Ekaterina Greenberg

The article lists the main and typical mistakes in the process of artificial breeding of Pacific salmon. All errors and violations are grouped by the periods of the production process (stages of the biotechnical chain), starting from working with producers and ending with the release of juveniles into natural reservoirs and watercourses. In addition, the degree of severity, economic and environmental consequences of such violations of biotechnics – immediate or delayed in their manifestations-are briefly described.

Author(s):  
Ekaterina Grinberg

In two parts of the article, more than 70 errors and violations of the Biotechnics of artificial breeding of Pacific salmon in salmon hatcheries are collected and summarized, which lead to an immediate or delayed deterioration of the quality of reared fry and a decrease in their survival rate. Deviations from the biological basis of fish farming are shown and possible consequences of such errors or violations are predicted. In the first part of the article (#7,2020) there were General errors (throughout the entire fish-breeding process), as well as violations of Biotechnics during the work with producers, collecting eggs and preparing them for incubation, in the second part-violations of Biotechnics during the incubation of eggs, holding pre-larvae, rearing and release of young. Their correction, prevention or minimization of consequences will significantly improve the quality of sexual products and offspring from producers, increase the linear and weight gain of juveniles during rearing, improve the coefficient of feed payment, reduce the time of rearing, improve the epizootic situation by developing immunity in fry and mobilizing other protective reactions of their body, significantly reduce waste at all stages of the production process, increasing survival by 10–15%. In conclusion, it is noted that the first and most important condition for an efficient salmon hatchery is the creation of optimal environmental conditions at each stage of the production process. The second condition is strict compliance with the Biotechnics of artificial salmon breeding and the complex of veterinary and sanitary, fish-breeding and meliorative and therapeutic and preventive measures. The third is the availability of competent specialists who regularly improve their skills in accredited Universities to implement, control and manage the first two conditions.


Author(s):  
E. Grinberg

The article contains and summarizes typical biotechnical errors and violations that are made on a daily and routine basis by fish breeders. Deviations from the biological basis of fish breeding are also shown and possible consequences of such errors or violations are predicted. Their correction, prevention or minimization of consequences, will significantly improve the quality of sexual products and offspring from producers, increase the linear and weight gain of juveniles during rearing, improve the feed payment coefficient, reduce the time of rearing, improve the epizootic situation by developing immunity in fry and mobilizing other protective reactions of their body, significantly reduce waste at all stages of the production process, increasing the survival rate of fry by 10–15 %.


2019 ◽  
Vol 28 (9) ◽  
pp. 50-53
Author(s):  
N.N. Martynov ◽  
◽  
G.A. Sidorenko ◽  
G.B. Zinyukhin ◽  
E.Sh. Maneeva ◽  
...  
Keyword(s):  

2018 ◽  
Vol 4 (2) ◽  
pp. 43-55
Author(s):  
Ika Yulianti ◽  
Endah Masrunik ◽  
Anam Miftakhul Huda ◽  
Diana Elvianita

This study aims to find a comparison of the calculation of the cost of goods manufactured in the CV. Mitra Setia Blitar uses the company's method and uses the Job Order Costing (JOC) method. The method used in this study is quantitative. The types of data used are quantitative and qualitative. Quantitative data is in the form of map production cost data while qualitative data is in the form of information about map production process. The result of calculating the cost of production of the map between the two methods results in a difference of Rp. 306. Calculation using the company method is more expensive than using the Job Order Costing method. Calculation of cost of goods manufactured using the company method is Rp. 2,205,000, - or Rp. 2,205, - each unit. While using the Job Order Costing (JOC) method is Rp. 1,899,000, - or Rp 1,899, - each unit. So that the right method used in calculating the cost of production is the Job Order Costing (JOC) method


2016 ◽  
Vol 559 ◽  
pp. 201-215 ◽  
Author(s):  
JW Moore ◽  
J Gordon ◽  
C Carr-Harris ◽  
AS Gottesfeld ◽  
SM Wilson ◽  
...  

Científica ◽  
2016 ◽  
Vol 44 (3) ◽  
pp. 412 ◽  
Author(s):  
Rafael Marani Barbosa ◽  
Bruno Guilherme Torres Licursi Vieira ◽  
Francisco Guilhien Gomes-Junior ◽  
Roberval Daiton Vieira

Sign in / Sign up

Export Citation Format

Share Document