Prudhoe Bay Study of Horizontal Well Injectivity and Recommended Approach to Achieving Long Term Efficient Water-flooding

Author(s):  
V.U. Imeh ◽  
L. Murray ◽  
D. Lenig ◽  
D. Robertson ◽  
M. Panda
2007 ◽  
Author(s):  
Victoria Uduak Imeh ◽  
Daniel Burton Robertson ◽  
Laurence Roderick Murray ◽  
David C. Lenig ◽  
Manmath Nath Panda

2007 ◽  
Author(s):  
Victoria Uduak Imeh ◽  
Daniel Burton Robertson ◽  
Laurence Roderick Murray ◽  
David C. Lenig ◽  
Manmath Nath Panda

2021 ◽  
pp. 014459872110052
Author(s):  
Xizhe Li ◽  
Zhengming Yang ◽  
Shujun Li ◽  
Wei Huang ◽  
Jianfei Zhan ◽  
...  

Low-permeability to ultralow-permeability reservoirs of the China National Petroleum Corporation are crucial to increase the reserve volumes and the production of crude oil in the present and future times. This study aimed to address the two major technical bottlenecks faced by the low-permeability to ultralow-permeability reservoirs by a comprehensive use of technologies and methods such as rate-controlled mercury injection, nuclear magnetic resonance, conventional logging, physical simulation, numerical simulation, and field practices. The reservoir characteristics of low-permeability to ultralow-permeability reservoirs were first analyzed. The water flooding development adjustment mode in the middle and high water-cut stages for the low-permeability to ultralow-permeability reservoirs, where water is injected along the fracture zone and lateral displacement were established. The formation mechanism and distribution principles of dynamic fractures, residual oil description, and expanding sweep volume were studied. The development mode for Type II ultralow-permeability reservoirs with a combination of horizontal well and volume fracturing was determined; this led to a significant improvement in the initial stages of single-well production. The volume fracturing core theory and optimization design, horizontal well trajectory optimization adjustment, horizontal well injection-production well pattern optimization, and horizontal well staged fracturing suitable for reservoirs with different characteristics were developed. This understanding of the reservoir characteristics and the breakthrough of key technologies for effective development will substantially support the oil-gas valent weight of the Changqing Oilfield to exceed 50 million tons per year, the stable production of the Daqing Oilfield with 40 million tons per year (oil-gas valent weight), and the realization of 20 million tons per year (oil-gas valent weight) in the Xinjiang Oilfield.


2021 ◽  
Author(s):  
Suria Amalia Suut ◽  
Mahmood Khamis Al Kalbani ◽  
Issa Quseimi ◽  
Abdullah Gahaffi ◽  
Arjen Wielaard ◽  
...  

Abstract This paper summarises a ONE development success story of reviving a mature brownfield in South of Oman, Field β, just within ONE year through collaboration between different disciplines, comprehensive data analysis, optimising and recompletion of existing wells. Field β, comprised of multi-stacked clastic reservoirs, was put on stream in 1980s and peaked in early 1990s. Pilot water injection started in 1993 and full field water flooding continued in 1997. After more than 35 years since start of production, one can say the field was already in the tail end of its life. It had been stabilizing at low rate after 25 years and starting to decline further and at some point was one of the potential candidates to be decommissioned. A new FDP (FDP18) for part of the field was delivered in 2018 with the first well drilled at the end of that year. In 2019, despite drilling further wells on the FDP18, production was declining and was at 2018 rate towards the year end. Intensive data analysis and integrated reservoir reviews per reservoir layers were actively performed and new opportunities and data gathering were identified. FDP18 wells from 2019 onwards were then deepened to also acquire log data over deeper than the target reservoirs. Further synergy between asset and exploration teams also instigated in new discoveries including oil in shallower carbonate reservoirs, which were logged and sampled when drilling the FDP18 wells. Declining production, low oil price and COVID-19 crisis that hit 2020 challenged the team to be more resilient and with ONE development mindset between development and WRFM team, also between asset and exploration team, existing long-term closed in and very low productivity wells were utilised to tap these new opportunities. As a result, the field production has been increased by more than double, highest since 10 years ago, with a potential of triple its production rate, all achieved through optimizing and recompletion of existing wells within 1 year, at a very attractive low UTC.


2021 ◽  
Author(s):  
Bipin Jain ◽  
Abhijeet Tambe ◽  
Dylan Waugh ◽  
Moises MunozRivera ◽  
Rianne Campbell

Abstract Several injection wells in Prudhoe Bay, Alaska exhibit sustained casing pressure (SCP) between the production tubing and the inner casing. The diagnostics on these wells have shown communication due to issues with casing leaks. Conventional cement systems have historically been used in coiled-tubing-delivered squeeze jobs to repair the leaks. However, even when these squeeze jobs are executed successfully, there is no guarantee in the short or long term that the annular communication is repaired. Many of these injector wells develop SCP in the range of 300-400 psi post-repair. It has been observed that the SCP development can reoccur immediately after annulus communication repair, or months to years after an injector well is put back on injection. Once SCP is developed the well cannot be operated further. A new generation of cement system was used to overcome the remedial challenge presented in these injector wells. This document provides the successful application of a specialized adaptive cement system conveyed to the problematic zone with the advantage of using coiled tubing equipment for optimum delivery of the remedial treatment.