The Special Construction Scheme Exploration of the South-to-North Water Transfer Project Approach Bridge in the Upper Box Girder Bridge
2013 ◽
Vol 368-370
◽
pp. 1481-1486
Keyword(s):
In this paper, combined with the approach bridge of cast-in-place continuous box girder project,discussion on the main bridge construction with support cast-in-place scheme design.The role of a great reference for large-scale projects,from the implementation of the index statistics, analysis shows that, to achieve even better than the specification requirements, and achieved the desired results.
2012 ◽
Vol 238
◽
pp. 325-328
Keyword(s):
2013 ◽
Vol 368-370
◽
pp. 1123-1127
Keyword(s):
2013 ◽
Vol 275-277
◽
pp. 961-965
Keyword(s):
Keyword(s):
2012 ◽
Vol 204-208
◽
pp. 2200-2204
2012 ◽
Vol 238
◽
pp. 333-336
Keyword(s):
2021 ◽
Keyword(s):
2012 ◽
Vol 178-181
◽
pp. 2526-2529
Keyword(s):
2014 ◽
Vol 1028
◽
pp. 300-304
Keyword(s):