Analysis of Investment Control in Construction Project’s Whole Process

2014 ◽  
Vol 584-586 ◽  
pp. 2415-2418
Author(s):  
Jing Chun Qi

This paper discusses the main methods of the whole process of construction project investment control Including the budget review, bidding control, contract, change management, progress payment disbursed, final accounts audit, etc., with putting forward problems and suggestions that should pay attention to make the project investment control and emphasizing the trinity system of control approaches in advance for effective management of project investment scientifically to make good use of construction funds.

2012 ◽  
Vol 209-211 ◽  
pp. 1294-1297
Author(s):  
Zhen Wen ◽  
Qi Lan Zhou

FIDIC contract terms content is quite widespread, it cover project management, technology, economy, law, insurance and so on. It is a normative document been revolve around construction project consultation and management. FIDIC made very detailed regulations to construction management three fields (investment control, quality control and progress control) from law, management, economy, technology and other fields. FIDIC had been became internationally recognized standardization document. It could be use every stage of construction management. This paper through analyze FIDIC contract and combine current construction management state,finally give some advices for construction management.


2011 ◽  
Vol 130-134 ◽  
pp. 1123-1127
Author(s):  
Jun Li Peng ◽  
Xiao Li

Project Investment Control runs through the whole process of project construction, and after the future decision-making stage, the design, tendering, construction, and the final account of the cost-control effect determine the final results of project investment control. In this paper, reference to relevant examples of actual projects, not only discusses the factors that affect the project investment during each stage of project implementation, but also suggests some corresponding control measures in use of life cycle theory, designed to provide reference for investment control of project construction.


2013 ◽  
Vol 405-408 ◽  
pp. 1231-1234
Author(s):  
Qiang Qiang Zhang ◽  
Yi Lao ◽  
Ling Huang

Through the elaboration of the management towards the whole process of preliminary feasibility demonstration, planning of design, construction process and completion settlement about Hangzhou subway construction project, the paper summarizes and analyzes the conditions of subway construction project in the aspect of investment control management, in addition to the analysis of the reasons for some problems occurred and finally puts forward some measures and suggestions to improve the investment control management of subway construction project with an aim to enhance the ability of investment control management towards the subway construction projects in Hangzhou and other domestic regions.


2021 ◽  
Vol 276 ◽  
pp. 02005
Author(s):  
Huilin Chen

The relatively weak link in the current construction project management is the project investment control. There is often a lack of accurate investigation beforehand and the lack of real investigation data, resulting in the lack of authenticity of the investigation report, and it is difficult to calculate the investment spent on the project. Engineering projects are prone to investment risks and cause unnecessary losses. Construction project investment is related to the future development trend of the construction industry. In order to adapt to the development needs of the society, this article discusses current engineering projects from the four key aspects of project investment control—optimized design, good bidding, scientific management, and strengthening of audits. There are problems in the investment process, and the corresponding investment control strategies are discussed. The research conclusions show that these four key aspects play a very important role in engineering project investment control.


Sign in / Sign up

Export Citation Format

Share Document