Optimization of Relay Graph Splicing Based on Repulsion-Tension Algorithm

2014 ◽  
Vol 672-674 ◽  
pp. 1048-1053
Author(s):  
Xu Gao ◽  
Li Yan Du ◽  
Xue Dong Li

At present, distributed integration setting calculation mode is widely used in power system. However, there are cross and overlap issues in protection relay model splicing process. Deeply researched in the characteristic of integrated relay splicing, according to power system network topology, an intelligent substation locating method based on the repulsion tension algorithm is applied in this paper. Finally, an example is used to verify the feasibility of the method.

2015 ◽  
Vol 743 ◽  
pp. 257-262
Author(s):  
Ming Jong Lin

Critical clearing time is to determine the time point of the collapse of the power system when the power system occur transient stability by a huge of failure. So that the one is an important data on protection system in power system. Therefore as an electrical engineer must to look on mostly the point of one to analyze and design in the power. In this paper, through the protection relay and breaker analysis of operation to know the team of protection relay how to complete the automatic monitoring and isolated the fault-equipment in power system. To study and analyze the swing equation and equal area criterion, we found out the relation of critical clearing time is changed with power factor and frequency. The critical clearing time was verified a non-constant value which is changed with the power factor and; if the load power factor is high, the critical clearing time is high but the frequency is high, the critical clearing time is low with system swing in the transient stability. This paper will be verify below each paragraph.


2014 ◽  
Vol 574 ◽  
pp. 324-328
Author(s):  
Nian Fang ◽  
Xian Shan Li ◽  
Hao Xu ◽  
Yu Long Du

The configuration and setting calculation of auxiliary power protection are directly related to the regular and safe operation of the equipments, thereby affecting the security and stability of the power plant. The system features are analyzed in depth according to the operational requirements of auxiliary power system protection in Xiangjiaba hydropower plant ,the system model is built on the basis of the actual project, and a variety of short-circuit current calculations are carried out. At last, the setting of the auxiliary power system relay protection is completed. This thesis also proposes solutions to the emerging problems in the process of protection setting. The results of the setting have been applied to the actual operation and no misoperation or maloperation caused by improper constant setting value has occurred so far in Xiangjiaba hydropower plant.


Author(s):  
Ming-Jong Lin ◽  
Jeeng-Min Ling

Aims: to avoid improper critical clearing time values due to clerical errors during the artificial calculation process, so that takes advantage of MATLAB application software to compile with those equations such as power angle, swing equation, equal area criterions, etc. to calculate of critical clearing time. Study Design: This article starts introduction with what the way of the calculation such as power angle, swing equation, equal area criterions, etc in literature, and referred lots of the latest literature to develop. Place and Duration of Study: The setting of the critical clearing time plays an important role in the power system. The start-up time of any protection relay must be shorter than the critical clearing time; otherwise the fault will expand and cause serious damage when the system fails. Therefore, it is an important question the set time of the protection relay needed to caution in planning design. Methodology: To use MATLAB application software links with above equations to compile the program the calculation of critical clearing time. Results: The program has been proved very effective and accurate for calculating the reasonable setting value of proportion relay, the same time it would shortened of assignment time by design planners. Conclusion: Computerized operating procedures can be used to avoid improper critical clearing time values due to clerical errors during the artificial calculation process.


Sign in / Sign up

Export Citation Format

Share Document