Investment Decisions Based on the Postponed Options PROT Hydropower Project
2014 ◽
Vol 672-674
◽
pp. 2098-2105
Keyword(s):
The analysis and description of the current method used in hydropower project investment decisions and problems of the introduction of the Monte Carlo simulation method PROT hydropower project valuation. Examples of analysis results showed that: this method can better reflect the actual value of the uncertainty of hydropower projects, flexibility and projects to provide a reasonable basis for decision makers.
2006 ◽
Vol 49
(9-10)
◽
pp. 1643-1646
◽
Keyword(s):
1991 ◽
Vol 28
(10)
◽
pp. 900-906
◽
Keyword(s):
1997 ◽
Vol 6
(2)
◽
pp. 63-76
◽
Keyword(s):
2017 ◽
Vol 42
(39)
◽
pp. 24612-24619
◽
2020 ◽
Vol 35
(4)
◽
pp. 2162-2169