A Joint Model of Production and Preventive Maintenance Plan
2010 ◽
Vol 156-157
◽
pp. 18-23
Keyword(s):
We integrated run-based preventive maintenance (PM) into the production plan at the tactical level. The production plan was based on the single level capacitated lot-sizing problem (CLSP). We assumed the system reliability should be kept above certain threshold value to ensure the feasibility of the production plan; the reliability would be affected only by system running. Thus, PM would be triggered by the reliability requirement and the accumulated running time. We established this relationship as a nonlinear integer constraint in the joint model. We also proposed a branch and bound algorithm using CPLEX to solve the model. Finally, a numerical example was given to illustrate the difference between run-based and time-based PM.
2013 ◽
Vol 51
(5)
◽
pp. 1379-1391
◽
Keyword(s):
2008 ◽
Vol 112
(1)
◽
pp. 121-137
◽
Keyword(s):
2018 ◽
Vol 66
◽
pp. 119-126
◽
2021 ◽
Vol ahead-of-print
(ahead-of-print)
◽
Keyword(s):
2013 ◽
Vol 229
(1)
◽
pp. 279
◽
2011 ◽
Vol 211
(3)
◽
pp. 507-514
◽
Keyword(s):
Keyword(s):