Force Analysis of Inclined Asphalt Concrete Wall Rockfill Dam Structure

2011 ◽  
Vol 391-392 ◽  
pp. 724-727
Author(s):  
Li Xin Han

Through analyzing inclined asphalt concrete wall rockfill dam structure’s mechanical characteristics in construction process and operational process, this paper adopts finite element method to carry out simulation analysis for inclined asphalt concrete wall rockfill dam of Mobankeng reservoir. Deducing distribution law of the dam’s stress and displacement in construction process and operational process. Analysis results show that, inclined asphalt concrete wall rockfill dam of Mobankeng reservoir construction is reasonable, it meets the requirements for design.

2014 ◽  
Vol 488-489 ◽  
pp. 597-600
Author(s):  
Xiang Zan Xie

Through analyzing asphalt concrete inclined wall rockfill dam structures mechanical characteristics in construction process and operating process, this paper adopts finite element method to carry out simulation analysis for asphalt concrete inclined wall rockfill dam of Zhengcha reservoir. Deducing distribution law of the dams stress and displacement in construction process and operating process. Analysis results show that, asphalt concrete inclined wall rockfill dam of Zhengcha reservoir construction is reasonable, it meets the requirements for design.


2013 ◽  
Vol 394 ◽  
pp. 332-335
Author(s):  
Min Tan

Through analyzing dry masonry overflow dam structures mechanical characteristics in construction process and operational process, this paper adopts finite element method to carry out simulation analysis for dry masonry overflow dam of Daxilong reservoir. Deducing distribution law of the dams stress and displacement in construction process and operational process. Analysis results show that, dry masonry overflow dam of Daxilong reservoir construction is reasonable, it meets the requirements for design.


2013 ◽  
Vol 804 ◽  
pp. 311-315
Author(s):  
Ke Ding Liu

Through analyzing rockfill dam structures mechanical characteristics in construction process and operational process, this paper adopts finite element method to carry out structural analysis for rockfill dam of Changjiakeng reservoir. Deducing distribution law of the dams stress and displacement in construction process and operational process. Analysis results show that, rockfill dam construction of Changjiakeng reservoir is reasonable, it meets the requirements for design. The analysis results provide a certain reference for design and construction of rockfill dam structure.


2013 ◽  
Vol 394 ◽  
pp. 385-389
Author(s):  
Dongy Yu Ji

Through analyzing bitumen residuum concrete inclined wall rockfill dam structures mechanical characteristics in construction process and operational process, this paper adopts finite element method to carry out structural analysis for bitumen residuum concrete inclined wall rockfill dam of Fengguo reservoir. Deducing distribution law of the dams stress and displacement in construction process and operational process. Analysis results show that, bitumen residuum concrete inclined wall rockfill dam construction of Fengguo reservoir is reasonable, it meets the requirements for design.


2013 ◽  
Vol 804 ◽  
pp. 325-328
Author(s):  
Xiang Zan Xie

This paper adopts finite element method to carry out simulation analysis for Bachimen wire mesh concrete U-shaped aqueduct. Deducing variation law of the aqueducts stress and displacement in construction process and operational process, researching the rationality of aqueduct structure design scheme. Analysis results show that, Bachimen wire mesh concrete aqueduct structure is reasonable, force of aqueduct structure is explicit, it meets the requirements for design. The research results provide a certain reference for design of wire mesh concrete U-shaped aqueduct structure.


2013 ◽  
Vol 394 ◽  
pp. 340-344
Author(s):  
Ke Ding Liu

This paper adopts universal finite element calculation software to carry out force analysis for Meiliao trench-buried inverted siphon,computer is applied in analysis of trench-buried inverted siphon. Deducing variation law of the inverted siphons stress and displacement in construction process and operational process. The calculation results further shown design schemes rationality and safety. Analysis results show that, force of Meiliao trench-buried inverted siphon structure is explicit, it meets the requirements for design.


2014 ◽  
Vol 716-717 ◽  
pp. 448-451
Author(s):  
Yue Liang Liu

Overpass is the important part of urban transportation infrastructure. This paper adopts finite element method to carry out three-dimensional finite element simulation analysis for Longhai railway separate overpass. Researching variation law of the overpass’s stress and displacement in construction process and operating process. Analysis results show that, structure of Longhai railway separate overpass is reasonable, force of overpass structure is explicit, it meets the requirements for engineering.


2013 ◽  
Vol 394 ◽  
pp. 345-348
Author(s):  
Min Tan

This paper adopts finite element method to carry out simulation analysis for Enzitan reinforced concrete U-shaped aqueduct. Deducing variation law of the aqueducts stress and displacement in construction process and operational process, researching the rationality of aqueduct structure design scheme. Analysis results show that, Enzitan reinforced concrete aqueduct structure is reasonable, force of aqueduct structure is explicit, it meets the requirements for design.


2011 ◽  
Vol 295-297 ◽  
pp. 2413-2416
Author(s):  
Dong Yu Ji ◽  
Wen Liang Ma

In this paper, finite element simulative analysis is proceeded for reinforced concrete face rockfill dam of Qianqiao reservoir. Deducing variation law of the dam’s stress and displacement in construction process and operational process. The analytic results are shown:reinforced concrete face rockfill dam of Qianqiao reservoir is reasonable structure, and every index meets the requirements for design.


2013 ◽  
Vol 644 ◽  
pp. 362-365
Author(s):  
Ke Ding Liu

Through researching gravity wall rockfill dam structure’s mechanical characteristics in construction and operating process, this paper adopts finite element method to carry out simulation analysis for gravity wall rockfill dam of Gaozhai reservoir. Deducing distribution laws of the dam’s stress and displacement in construction and operating process. Analysis results show that, gravity wall rockfill dam construction of Gaozhai reservoir is reasonable, it meets the requirements for design.


Sign in / Sign up

Export Citation Format

Share Document