Structural Analysis for Bitumen Residuum Concrete Inclined Wall Rockfill Dam of Fengguo Reservoir

2013 ◽  
Vol 394 ◽  
pp. 385-389
Author(s):  
Dongy Yu Ji

Through analyzing bitumen residuum concrete inclined wall rockfill dam structures mechanical characteristics in construction process and operational process, this paper adopts finite element method to carry out structural analysis for bitumen residuum concrete inclined wall rockfill dam of Fengguo reservoir. Deducing distribution law of the dams stress and displacement in construction process and operational process. Analysis results show that, bitumen residuum concrete inclined wall rockfill dam construction of Fengguo reservoir is reasonable, it meets the requirements for design.

2013 ◽  
Vol 394 ◽  
pp. 332-335
Author(s):  
Min Tan

Through analyzing dry masonry overflow dam structures mechanical characteristics in construction process and operational process, this paper adopts finite element method to carry out simulation analysis for dry masonry overflow dam of Daxilong reservoir. Deducing distribution law of the dams stress and displacement in construction process and operational process. Analysis results show that, dry masonry overflow dam of Daxilong reservoir construction is reasonable, it meets the requirements for design.


2013 ◽  
Vol 804 ◽  
pp. 311-315
Author(s):  
Ke Ding Liu

Through analyzing rockfill dam structures mechanical characteristics in construction process and operational process, this paper adopts finite element method to carry out structural analysis for rockfill dam of Changjiakeng reservoir. Deducing distribution law of the dams stress and displacement in construction process and operational process. Analysis results show that, rockfill dam construction of Changjiakeng reservoir is reasonable, it meets the requirements for design. The analysis results provide a certain reference for design and construction of rockfill dam structure.


2011 ◽  
Vol 391-392 ◽  
pp. 724-727
Author(s):  
Li Xin Han

Through analyzing inclined asphalt concrete wall rockfill dam structure’s mechanical characteristics in construction process and operational process, this paper adopts finite element method to carry out simulation analysis for inclined asphalt concrete wall rockfill dam of Mobankeng reservoir. Deducing distribution law of the dam’s stress and displacement in construction process and operational process. Analysis results show that, inclined asphalt concrete wall rockfill dam of Mobankeng reservoir construction is reasonable, it meets the requirements for design.


2013 ◽  
Vol 644 ◽  
pp. 362-365
Author(s):  
Ke Ding Liu

Through researching gravity wall rockfill dam structure’s mechanical characteristics in construction and operating process, this paper adopts finite element method to carry out simulation analysis for gravity wall rockfill dam of Gaozhai reservoir. Deducing distribution laws of the dam’s stress and displacement in construction and operating process. Analysis results show that, gravity wall rockfill dam construction of Gaozhai reservoir is reasonable, it meets the requirements for design.


2014 ◽  
Vol 488-489 ◽  
pp. 597-600
Author(s):  
Xiang Zan Xie

Through analyzing asphalt concrete inclined wall rockfill dam structures mechanical characteristics in construction process and operating process, this paper adopts finite element method to carry out simulation analysis for asphalt concrete inclined wall rockfill dam of Zhengcha reservoir. Deducing distribution law of the dams stress and displacement in construction process and operating process. Analysis results show that, asphalt concrete inclined wall rockfill dam of Zhengcha reservoir construction is reasonable, it meets the requirements for design.


2013 ◽  
Vol 394 ◽  
pp. 345-348
Author(s):  
Min Tan

This paper adopts finite element method to carry out simulation analysis for Enzitan reinforced concrete U-shaped aqueduct. Deducing variation law of the aqueducts stress and displacement in construction process and operational process, researching the rationality of aqueduct structure design scheme. Analysis results show that, Enzitan reinforced concrete aqueduct structure is reasonable, force of aqueduct structure is explicit, it meets the requirements for design.


2011 ◽  
Vol 295-297 ◽  
pp. 2413-2416
Author(s):  
Dong Yu Ji ◽  
Wen Liang Ma

In this paper, finite element simulative analysis is proceeded for reinforced concrete face rockfill dam of Qianqiao reservoir. Deducing variation law of the dam’s stress and displacement in construction process and operational process. The analytic results are shown:reinforced concrete face rockfill dam of Qianqiao reservoir is reasonable structure, and every index meets the requirements for design.


2013 ◽  
Vol 804 ◽  
pp. 325-328
Author(s):  
Xiang Zan Xie

This paper adopts finite element method to carry out simulation analysis for Bachimen wire mesh concrete U-shaped aqueduct. Deducing variation law of the aqueducts stress and displacement in construction process and operational process, researching the rationality of aqueduct structure design scheme. Analysis results show that, Bachimen wire mesh concrete aqueduct structure is reasonable, force of aqueduct structure is explicit, it meets the requirements for design. The research results provide a certain reference for design of wire mesh concrete U-shaped aqueduct structure.


2018 ◽  
Vol 177 ◽  
pp. 01027
Author(s):  
Muhammad Nurul Misbah ◽  
Septia Hardy Sujiatanti ◽  
Dony Setyawan ◽  
Rizky Chandra Ariesta ◽  
Satriyo Rahmadianto

Deformation is unavoidable in some stages of the ship production process. Deformation occurs when the blocks are lifted in an erroneous eye pad position. The aim of this study was to determine behaviour of the ship structures during assembly and lifting process. A typical tanker was used as the basic structural shape. The bottom structures was modeled to be analyzed. In this study, deformations and stresses on the bottom structures during the block lifting are investigated using the finite element method. The deformations and stresses are evaluated and critical condition detected. The preferable block lifting method with the minimum distortion on the bottom structures of tanker is proposed.


2014 ◽  
Vol 488-489 ◽  
pp. 565-568
Author(s):  
Dong Yu Ji

Through analyzing concrete gravity dam structures mechanical characteristics in construction process and operating process, this paper adopts finite element method to carry out structural analysis for concrete gravity dam of Shachang reservoir. Deducing distribution law of the dams stress and displacement in construction process and operating process. Analysis results show that, concrete gravity dam of Shachang reservoir is reasonable, it meets the requirements for design. The analysis results provide a certain reference for design and construction of concrete gravity dam structure.


Sign in / Sign up

Export Citation Format

Share Document