The Struture Model and Empirical for the Satellite Navigation Engineering Project Risk Management

2013 ◽  
Vol 860-863 ◽  
pp. 3082-3089 ◽  
Author(s):  
Chao Yang

Project risk management is a vital dimension of project management. Based on the theory of metasynthesis, this dissertation analyses the risk of some satellite navigation engineering project from three aspects of "time", "module" and "risk management logic". Taking this frame as outline, the paper forms a three-dimensional structure model and conducts the empirical research with approaches of grade holographic modelling method, AHP and various risk management techniques. At last, the study concludes some significant guidance on methodology and application for the satellite navigation engineering project.

2012 ◽  
Vol 174-177 ◽  
pp. 2754-2758
Author(s):  
Zhao Bin Wei ◽  
Gui Rong Zhu

Abstract. Lots of various risks will exist in the whole process that is from construction to completion of project, whose management model is project agent-construction system. If construction agent can’t focus more importance on the cognition and management of risk occurring in the whole process of engineering project implementation, the successful accomplishment of engineering project will be influenced consequentially. In this paper, it is combined that the theory of project risk management and the practice of project agent-construction system from the construction agent’s viewpoint, then the risk of project agent-construction system is analyzed, and the precautions against risk are studied. It is of great significance and high practical values to carry out agent-construction system more preferably for construction agent.


2011 ◽  
Vol 99-100 ◽  
pp. 233-237 ◽  
Author(s):  
Yun Peng Hu

The construction contracts are the important basis of the project risk management and a reasonable contract system can effectively share engineering risks among various project participants. However, the current situation of risk management in China is not optimistic. Based on the analysis of the existing problems in the risk sharing management, the paper introduces Hall three dimension structure into the engineering fields and establishes a three-dimensional (contract dimension, procedure dimension and logic dimension) space structure of the construction project to elaborate the vital role of the contracts in the project risk management. Finally, the paper attempts to put forward a risk sharing mode centered on contract systems to make a reasonable and effective risk distribution among various project participants


2014 ◽  
Vol 1044-1045 ◽  
pp. 1760-1763
Author(s):  
Jin Ping Liu

The importance and urgency of construction engineering project risk management is in the process of China's construction industry in line with international standards gradually emerge. Construction project risk management is to determine the needs of the market economy system. With the rapid development of modern industry and modern science and technology, both in developed countries and developing spend a lot of money on basic construction. Therefore engineering construction project has the characteristics of risk big uncertainty, risk, etc. So we should strengthen the construction of the project risk management, is conducive to capital construction and development of the national economy in our country. This article focus on the legal risks in the process of project bidding for the prevention and control.


2014 ◽  
Vol 687-691 ◽  
pp. 4815-4818
Author(s):  
Zhang Lin Guo ◽  
Ya Zhen Hu ◽  
Jun E Liu

Contractors for the construction of the risk in the contract clause clear analysis is an important content of construction project risk management. Based on the 1999 edition of FIDIC contract conditions for construction of the demonstration text as the research object, according to the risk and responsibility on the contractor risk clause matching principle clear classification. To provide the contractor some experience for reference which the contractor could better control of engineering project contract risk.


2014 ◽  
Vol 651-653 ◽  
pp. 1711-1716
Author(s):  
Yao Yu Jin

Due to the risk of large-scale public welfare project and a wide variety of intricate link between various risks, the success of its projects is a great significance for the development of China's construction industry, many issues still need further research, particularly research project risk assessment. the theoretical research evaluation of large-scale public welfare project risks are becoming a core of project risk management, this paper presents a comprehensive evaluation of large-scale public utilities engineering project risk based on entropy method, and through case studies, large public utilities project risk management provides a simple, more objective methods of analysis for policy-makers to play the role of the project.


2014 ◽  
Vol 919-921 ◽  
pp. 1462-1465
Author(s):  
Hong Chang

This document introduces and demonstrates the application of the risk matrix method on the engineering project risk management. The engineering project life cycle, risk categories, each risk management and the influence of the risk are considered in the project risk management, risk matrix suitable for the engineering project is established. A case is given to explain the application of the matrix method.