Discussion on Progress Control and Quality Control in Railway Signal Engineering Construction

2021 ◽  
2012 ◽  
Vol 209-211 ◽  
pp. 1294-1297
Author(s):  
Zhen Wen ◽  
Qi Lan Zhou

FIDIC contract terms content is quite widespread, it cover project management, technology, economy, law, insurance and so on. It is a normative document been revolve around construction project consultation and management. FIDIC made very detailed regulations to construction management three fields (investment control, quality control and progress control) from law, management, economy, technology and other fields. FIDIC had been became internationally recognized standardization document. It could be use every stage of construction management. This paper through analyze FIDIC contract and combine current construction management state,finally give some advices for construction management.


Author(s):  
Jie Fang ◽  
Yan Li ◽  
Qi Liao ◽  
Zenghui Ren ◽  
Baohong Xie

The construction schedule control of construction project is within the prescribed period of time to develop a scientific and reasonable plan, and when executed timely check construction progress, the knowledge of construction progress, and then analyzed the construction plan, timely correcting and deal with the deviation, and take effective solutions to promote the project smoothly.Construction engineering plays an important role in economic development, so it can guarantee the quality of construction.This paper analyzes the management of construction engineering construction progress control and control methods of construction engineering project, the aiming at the influence factors of construction engineering construction progress, the control and management measures are put forward for reference.


2013 ◽  
Vol 711 ◽  
pp. 790-793
Author(s):  
Dong Xiao Niu ◽  
Tong Liu ◽  
Shu Yi Zhou ◽  
Ting Ting Chen

In the process of engineering project construction, cost management should be closely around three big targets: cost control, quality control and progress control. This paper analyzes the interacting relationship of these factors, then discussing the elements of engineering cost management based on the earned value method. Finally, it proposed some corresponding suggestions and measures for the developing of cost management.