Research on the Application of Common Engineering Project Management Mode in Green Building Project

2021 ◽  
2020 ◽  
Vol 3 (2) ◽  
pp. 18
Author(s):  
Xianming Wang

In order to realize the standardization and normalization of environmental protection project management. This paper uses the literature method to study the current status of the existing project management mode, and points out the problems: lack of a sound project management system, insufficient information application of project management, and unclear decentralization in project management; on this basis, this paper proposes optimization strategies from the aspects of perfecting the engineering project management system, clarifying the allocation of project management authority, and strengthening the construction of engineering project management information. And put forward the future development trend of project engineering management, on the basis of two mainstream management modes of BOT (Build-Operate-Transfer) and EPC (Engineering Procurement Construction), build a standardized project management platform to achieve intelligent management. Realize intelligent management of engineering project management to achieve standardization and standardization, greatly improving the efficiency of project management.


2019 ◽  
Vol 136 ◽  
pp. 03004
Author(s):  
Weihua Yang ◽  
Feige Fan ◽  
Ling Li

PPP energy engineering project is related to the life of the people and the development of the country. According to the data disclosed by the Ministry of Finance, the investment scale is huge and the interest subjects involved are complex. How to coordinate many subjects to maximize the overall interests of the project is the main problem at present. In this paper, the collaborative theory can be introduced into PPP energy engineering project management to solve this problem, the present situation of PPP energy project management is discussed, and the dynamic collaborative sharing model is put forward on the basis of vertical life cycle management and horizontal community of destiny management.


2012 ◽  
Vol 575 ◽  
pp. 50-54
Author(s):  
Xu Ling Liu

Construction project management is a method system that takes whole process and all-around control and management of the construction project engineer. The characteristics of both the common project management mode and the new innovation mode are discussed in this passage. Put forward construction project and responsibility system management mode after having discussed how to innovation building project management mode.


2011 ◽  
Vol 94-96 ◽  
pp. 2238-2242
Author(s):  
Yan Qun Tang ◽  
Wei Zeng

Basing on the analysis of problems existing in the comprehensive decision-making and balanced optimizing of project programs, the writer has introduced the method of physical planning to solve the problems of comprehensive decision-making and optimizing in the quality of the project management – time limit for a project - cost, and established the quality - time limit for a project- cost comprehensive evaluation and decision model as well as the quality - time limit for a project - cost optimization model. The proposed method has been proved effective through the cases of highway engineering project management.