Technical Research on Process Optimization of Cooling Tower in Circulating Water System

2021 ◽  
Author(s):  
Robert M. Morgenstern

Westar Lawrence Energy Center Unit 5 in Lawrence, Kansas is a 375 mW unit that utilized a closed loop circulating water system with a wooden cooling tower and three horizontal circulating water pumps to provide cooling water to the condenser. The wooden cooling tower experienced rapid degradation over the past five years of operation. Chlorine was added to the water chemistry to reduce attack of the wooden components, but the chlorine levels in the water caused accelerated corrosion of the pump components and base plates. Circulating water system capacity was reduced due to worn pump components and excessive clearances. Unit load was limited by the lack of adequate circulating water capacity. This paper discusses the pump and motor repairs, design changes performed in parallel with demolition of the wooden cooling tower, and replacement with a new fiberglass tower designed to utilize the existing concrete basin. All of the changes were implemented during an outage in April-May 2009.


2013 ◽  
Vol 281 ◽  
pp. 537-541
Author(s):  
Jian Ping Chen ◽  
Xiao Kuan Shi ◽  
Hai Jun Li

In order to improve the effective utilization of the cooling tower fan industrial circulating water system, and to achieve the purpose of energy saving, the paper developed a closed loop cooling tower fan is jointly controlled by the PLC and inverter energy-saving control system. With the theoretical energy-saving fan characteristics analysis, PLC is used as a controller. Combined with inverter technology, remote real-time communication is carried out via RS485 bus with the host computer, and centralized monitoring to operating status of many sets of fans is realized. Production Practice has proved that under the premise of ensuring the water temperature standards, the inverter deceleration of the cooling tower fan makes significant energy savings effect.


2021 ◽  
Vol 676 (1) ◽  
pp. 012099
Author(s):  
Yao Yang ◽  
Xiaona Li ◽  
Xiang Li ◽  
Yuchao Li ◽  
Tianqi Meng ◽  
...  

1996 ◽  
Vol 42 (8) ◽  
pp. 811-818 ◽  
Author(s):  
Outi M. Zacheus ◽  
Pertti J. Martikainen

The decontamination of Legionella pneumophila and other heterotrophic microbes by heat flushing in four legionellae-positive hot water systems was studied. Before the decontamination procedure, the concentration of legionellae varied from 3.0 × 10−3 to 3.5 × 10−5 cfu/L and the hot water temperature from 43.6 to 51.5 °C. During the contamination the temperature was raised to 60–70 °C. All taps and showers were cleaned from sediments and flushed with hot water twice a day for several minutes. The decontamination lasted for 2–4 weeks. In a few weeks the heat-flushing method reduced the concentration of legionellae below the detection limit (50 cfu/L) in the hot circulating water system just before and after the heat exchanger. The high hot water temperature also decreased the viable counts of heterotrophic bacteria, fungi, and total microbial cells determined by the epifluorescent microscopy. However, the eradication of legionellae failed in a water system where the water temperature remained below 60 °C in some parts of the system. After the decontamination, the temperature of hot water was lowered to 55 °C. Thereafter, all the studied hot water systems were recolonized by legionellae within a few months, showing that the decontamination by heat flushing was temporary. Also, the contamination of other bacteria increased in a few months to the level before decontamination.Key words: legionellae, hot water system, decontamination, water temperature, heterotrophic bacteria.


2013 ◽  
Vol 401-403 ◽  
pp. 1144-1148
Author(s):  
Fen Su Shi ◽  
Yang Zhou ◽  
Yong Wu

In order to improve the manual monitoring methods of the circulating water in calcium carbide furnace, this paper designs a pressure loss alarm system about circulating water of calcium carbide furnace. The system completes real-time automation and control of circulating water system by combining PLC technology, field bus communication technology and configuration technology, which uses PROFIBUS field bus to communicate between upper computer and lower computer. The practical application shows that this system can effectively achieve real-time monitoring of the circulating water, fault diagnosis and maintenance management.


CORROSION ◽  
1960 ◽  
Vol 16 (10) ◽  
pp. 523t-529t ◽  
Author(s):  
HERMAN KERST

Abstract A laboratory method of testing water-side corrosion and scale deposition in the presence of high process side temperatures has been developed. Two types of specimens are used: (1) a hairpin of ¼ inch seamless steel tubing mounted on a pipe plug and inserted in the circulating water system, and (2) a miniature heat exchanger made of ½ inch seamless tubing and standard pipe parts. In studies on corrosion rates, and on calcium phosphate scale deposition under conditions of 130 F water temperature and 350–395 F hot-side temperatures, it was shown that corrosion rates may be increased up to 8 times over the rates on immersed coupons at 130 F. A possible method of calculating water-side skin temperatures is indicated. It was shown that the use of polyphosphate treatments, at residual levels high enough to give corrosion protection, leads to the deposition of calcium phosphate scale. The use of chromate in combination treatments reduces the amount of this scale deposited, and also appears to reduce the amount of carbonate scale. 4.6.1


Author(s):  
Mohammed Alismail

The circulating water system is a very important system in Ghazlan Steam Power Plant- 4276 MW, as it supplies the sea water to the tubes side of the Condensers during normal operation. A large butterfly cross-connect valve was installed at the circulating water pumps discharge header to isolate the pumps and the header for maintenance. A forced unit shutdown occurred due to valve’s shafts end leakage and collapse after maintenance work. This paper explains the wrong design location of the valve in the piping as the root cause of the problem. Analysis with ASME reference will be presented. This paper will also present potential solutions and actions taken as a lesson learned to avoid occurrence in other plants.