Using the Stages Model in Work Site Programs

Keyword(s):  
2020 ◽  
Vol 3 (1) ◽  
pp. 56
Author(s):  
Arkadiusz Gendek ◽  
Monika Aniszewska ◽  
Witold Zychowicz ◽  
Tadeusz Moskalik ◽  
Jan Malaťák ◽  
...  

The aim of the research was to verify the impact of selected parameters on the efficiency and organization of chipper operations. The paper analyzes chipping operations in Polish forests with a focus on work site location, overnight chipper location, chipper workload per site, fuel consumption, and work shift duration, as all of these factors may affect operating efficiency. The mean chipper travel distance between sites during a shift ranged from 4.74 km to 9.5 km (chippers moved on average every other day). The mean work shift duration was 12.4 h. At the end of a shift, the chippers traveled on average from 4.2 km to 6.3 km to an overnight location. At the beginning of a workday, the chippers were dispatched to sites at a distance of 2.5 km to 4.0 km. The average fuel consumption of the forwarder-mounted chippers was 16 L/h and that of the truck-mounted chipper was 7.7 L/h. It was found that the following actions have a decisive influence on the effectiveness of the operation of the chippers: determination of the size of individual tasks and the deployment of successive forest areas, indication of the proper location of the machine base, and the method of accessing the forest area.


1994 ◽  
Vol 15 (1) ◽  
pp. 31-42 ◽  
Author(s):  
Margot E. Kurtz ◽  
J. C. Kurtz ◽  
Barbara Given ◽  
Charles C. Given

Sensors ◽  
2021 ◽  
Vol 21 (12) ◽  
pp. 4227
Author(s):  
Nicolás Jacob-Loyola ◽  
Felipe Muñoz-La Rivera ◽  
Rodrigo F. Herrera ◽  
Edison Atencio

The physical progress of a construction project is monitored by an inspector responsible for verifying and backing up progress information, usually through site photography. Progress monitoring has improved, thanks to advances in image acquisition, computer vision, and the development of unmanned aerial vehicles (UAVs). However, no comprehensive and simple methodology exists to guide practitioners and facilitate the use of these methods. This research provides recommendations for the periodic recording of the physical progress of a construction site through the manual operation of UAVs and the use of point clouds obtained under photogrammetric techniques. The programmed progress is then compared with the actual progress made in a 4D BIM environment. This methodology was applied in the construction of a reinforced concrete residential building. The results showed the methodology is effective for UAV operation in the work site and the use of the photogrammetric visual records for the monitoring of the physical progress and the communication of the work performed to the project stakeholders.


1989 ◽  
Vol 89 (4) ◽  
pp. 543-544
Author(s):  
Wendy M. Sandoval ◽  
Holly D. Mueller

Sign in / Sign up

Export Citation Format

Share Document