Application of House of Quality in The Design Requirements for Flakes Machines in The Banana Flakes Production Process

Author(s):  
Aidil Haryanto ◽  
. Novrinaldi
2012 ◽  
Vol 155-156 ◽  
pp. 611-615
Author(s):  
Jin Hu Song

Agitator impeller consist of turbine blades, positioning plates, central axis, flange, blocking plate and steel by welding, It is a typical welded structure. In the production process easy to produce deformation, cracks, undercut, not fusion, porosity and other defects, affecting life,and it is important for tacking and welding for turbine blades and positioning plates. In order to prevent the generation of welding defects, to meet the design requirements, The process of tacking and welding for turbine blades and positioning plates is designed in this paper.


2021 ◽  
Vol ahead-of-print (ahead-of-print) ◽  
Author(s):  
Nabil I. El Sawalhi ◽  
Aisha N. Yazgi

Purpose The level of live, reduction of pollution and positive human health is affected by the quality of landscape. In addition, many benefits such as aesthetic, psychological and social can be achieved. The quality of landscape is integrated with the individual’s needs. The scope of landscape must be determined according to user needs and planning methods. The purpose of this study is to propose a house of quality (HOQ) model to identify the landscape design requirements. The Islamic University of Gaza (IUG) was used as a case study. The need to implement the proposed HOQ model has been identified. Also, the male and female students’ priorities have been identified, and the weight of campus landscape design elements was extracted. Design/methodology/approach The male and female IUG students’ needs were identified using a questionnaire survey. The data were analyzed for testing statistical validity and reliability using SPSS. HOQ model was built using EDRAW Max program. Findings The ten most important student needs are “cleanliness, praying, feeling safe, feeling comfortable psychic, drinking, spaciousness and breadth, shading, quiet, rest and sitting, and fresh air.” Based on these results and needs assessment, the HOQ was constructed. The most important design elements are “group of seats, shrubs, trees, lawns, pergola, and seats chairs or benches.” Originality/value This study adds to the designer’s knowledge about HOQ application in design, and contributes significantly to consider public participation as a way in collecting the voice of customers.


2012 ◽  
Vol 479-481 ◽  
pp. 2171-2176 ◽  
Author(s):  
Hong Bao ◽  
Guang Fu Liu ◽  
Ben Yang Bian

Mapping and processing customer requirements is one of key procedures in green design. The basic theory and methods of product environment requirements mapping and processing are researched, the implementation process of product environment requirements mapping and processing is identified, product environment requirements are mapped based on environmental House of Quality (HoQ). Design requirements conflict of the green product is eliminated by TRIZ. Finally, the mapping and processing of product environment requirements of a dishwasher is exemplified to validate the method.


2011 ◽  
Author(s):  
Alicia B. Fernandes ◽  
Philip J. Smith ◽  
Amy Spencer ◽  
Eric Wiley ◽  
Dustin Johnson

2019 ◽  
Vol 28 (9) ◽  
pp. 50-53
Author(s):  
N.N. Martynov ◽  
◽  
G.A. Sidorenko ◽  
G.B. Zinyukhin ◽  
E.Sh. Maneeva ◽  
...  
Keyword(s):  

2018 ◽  
Vol 4 (2) ◽  
pp. 43-55
Author(s):  
Ika Yulianti ◽  
Endah Masrunik ◽  
Anam Miftakhul Huda ◽  
Diana Elvianita

This study aims to find a comparison of the calculation of the cost of goods manufactured in the CV. Mitra Setia Blitar uses the company's method and uses the Job Order Costing (JOC) method. The method used in this study is quantitative. The types of data used are quantitative and qualitative. Quantitative data is in the form of map production cost data while qualitative data is in the form of information about map production process. The result of calculating the cost of production of the map between the two methods results in a difference of Rp. 306. Calculation using the company method is more expensive than using the Job Order Costing method. Calculation of cost of goods manufactured using the company method is Rp. 2,205,000, - or Rp. 2,205, - each unit. While using the Job Order Costing (JOC) method is Rp. 1,899,000, - or Rp 1,899, - each unit. So that the right method used in calculating the cost of production is the Job Order Costing (JOC) method


Sign in / Sign up

Export Citation Format

Share Document