scholarly journals Study of the Real Condition and Improvement Plans of a Fire Protection System Installed at Museum Storage

2018 ◽  
Vol 32 (3) ◽  
pp. 60-66
Author(s):  
Jong-A Park ◽  
◽  
Seung-Ho Joo ◽  
Eun-Soo Kang ◽  
Dae-Keon Lee ◽  
...  
1993 ◽  
Author(s):  
M. J. Wilson ◽  
B. R. Dees ◽  
J. H . Storm

2011 ◽  
Vol 11 ◽  
pp. 147-155 ◽  
Author(s):  
HUANG Yan-bo ◽  
HAN Bing ◽  
ZHAO Zhe

Author(s):  
Damon M. K. Taam ◽  
Chuck Conklin

After sixteen years of operation, it became apparent that the pit fire protection system installed during construction of the Spokane Regional Waste to Energy (WTE) Facility (1989–1991) was inadequate. A risk analysis was performed by Creighton Engineering Inc., a fire protection consulting firm, hired by the Spokane Regional Solid Waste System (Regional System) and Wheelabrator Spokane Inc. With input from Spokane County Fire District 10 and the City of Spokane Fire Department, a replacement supplemental fire protection system was designed and ultimately installed. This paper will describe the problems with the once state of the art fire system and the planning, design and installation of the new system.


Sign in / Sign up

Export Citation Format

Share Document