community development team
Recently Published Documents


TOTAL DOCUMENTS

2
(FIVE YEARS 2)

H-INDEX

0
(FIVE YEARS 0)

2021 ◽  
Vol 4 (1) ◽  
pp. 104
Author(s):  
Devyana Dyah Wulandari ◽  
Hotimah Masdan Salim ◽  
Andreas Putro Ragil Santoso ◽  
Endah Budi Permana Putri

Diabetes mellitus is a chronic disease caused by the pancreas not being able to produce enough insulin so that glucose levels in the blood cannot be controlled. Symptoms of this disease are characterized by polyuria, polydipsia, polyphagia and elevated blood glucose levels. Diabetes mellitus is a non-communicable disease that ranks 7th in the world's cause of death and Indonesia is a country with diabetes which is ranked 4th in the world. Prevention and treatment of diabetes mellitus patients can be done through various efforts, one of which is traditional herbal medicine. Therefore, the community development team held a training event for preparation scientific herbs in the context of preventing diabetes mellitus for residents of Wonokromo Surabaya. The results showed that there was an increase in public understanding about the dangers of diabetes mellitus with an increase in the average value from 45% to 90% and an increase in skills in preparation scientific herbal medicine from 40% to 95%. So it can be concluded that this activity brings very good benefits for the residents of Wonokromo Surabaya.


2020 ◽  
Vol 4 (1) ◽  
pp. 20-25
Author(s):  
Yayan Adi Saputro ◽  
Muhammad Khoirul Mahfidh

Community service activities by lecturers and students of the Civil Engineering study program, Faculty of Science and Technology, Islamic University of NahdlatulUlamaJepara at RT. 01 RW. 05 Kedungleper Village, Bangsri District is the construction of a concrete road (rigid pavement) to the tomb along 28 m, 3 m wide, and 0.12 m thick. Activities carried out include planning, implementation, monitoring and evaluation. The planning carried out by this community service team together with the village and community development team made drawings and RABs to be submitted to the village development planning deliberations. The implementation is carried out after approval of the proposal given by involving community assistance (community self-help) in 2 parts according to the day. On the first day there were 16 people doing self-help and on the second day there were 16 people. During the implementation process, the quality of work produced is carried out so that the results obtained are of good quality according to the plan.


Sign in / Sign up

Export Citation Format

Share Document