internal dumping
Recently Published Documents


TOTAL DOCUMENTS

10
(FIVE YEARS 6)

H-INDEX

2
(FIVE YEARS 1)

2021 ◽  
Vol 15 (4) ◽  
pp. 99-107
Author(s):  
Oleksii Cherniaiev ◽  
Artem Pavlychenko ◽  
Oleksandr Romanenko ◽  
Yurii Vovk

Purpose. Scientific substantiation of the expedient depth of mining the non-metallic deposits of rocky minerals on the basis of mathematical and statistical methods, which will ensure resource-saving and rational use of natural resources. Methods. To solve the purpose set, the following methods are used: graphical-analytical – when optimizing the maximum depth of mining the deposits of building materials, and the method of mathematical modeling – for determining the maximum depth of mining the non-metallic deposits with internal dumping. By means of statistical processing according to systematized types of deposits, the patterns of a change in the maximum depth of mining the basic deposits, depending on the main parameters of the quarry field, have been studied. Findings. A new methodology, which is distinguished by taking into account in-pit dumping, has been developed for calculating the maximum depth of granite quarries, which most of all influences the efficiency of mining operations and the value of economic indicators while ensuring the maximum economic effect with the achievement of a rational maximum depth of mining the deposit. A new, theoretically substantiated methodology has been created for determining the maximum depth of mining the mineral deposits for the production of crushed-stone products while providing the resource- and land-saving during the quarry operation. Originality. For the first time for these deposits, the dependence of their maximum mining depth on the main parameters of the quarry field and the place of internal dumping of overburden rocks has been determined. This has become a determining factor in the appropriate mining of deep non-metallic deposits of building materials with internal dumping, which provides a minimal land disturbance. Practical implications. The research results have been tested and implemented in working projects for mining the Liubymivske, Chaplynske, Pervomaiske, Mykytivske, Trykratske and Novoukrainske granite deposits; as a result of additional mining of mineral reserves, their additional increment in the volume from 1 to 48 million m3 is possible, which will ensure 5-40 years of sustainable operation of the mining enterprise.


2021 ◽  
Vol 315 ◽  
pp. 01015
Author(s):  
Alexei Selyukov

With surface mining of inclined and steeply dipping coal deposits, the so-called deeping longitudinal mining methods with a gradual deepening of mining from the surface to the final depth are widely spread, while orienting the mining front along the strike line of the seams (strata). When using such mining methods, the volumes of internal dumping are limited or completely absent; there is a peak-like increase in overburden volumes and transportation distance, the land resources disturbing proceeds at a progressive pace. In this regard, it is obvious that an important production task is to find technological solutions and methods to develop coal deposits that reduce the environmental hazard and increase resource conservation in mining by placing overburden in the mined-out space while reducing the area for external dumps and disturbing the earth's surface. If this is not foreseen at the present time, then all coal surface mines in the coming decades will be limited by their own external dumps of overburden, and their further development will be problematic.


Energies ◽  
2020 ◽  
Vol 13 (13) ◽  
pp. 3305 ◽  
Author(s):  
Sergey Zhironkin ◽  
Alexey Selyukov ◽  
Magerram Gasanov

The present paper deals with an original way to reduce the environmental damage caused to land and air resources by surface coal mines with external dumping, due to the transition to internal dumping with filling the worked out space of the surface mine with overburden. The basic principle of the proposed idea is the transition from the deepening longitudinal mining method for the development of inclined and steep coal seam strata to lateral ones. This article substantiates the choice of technology for a block-and-layer continuous lateral mining method, including the construction of a first-stage pit, the use of a combined transport and direct dumping technology for moving overburden to an internal dump when mining blocks using draglines. The advantage of the presented technology, along with filling the internal capacity of the surface mine field with overburden, is the possibility of leveling the relief within the boundaries of the pit allotment and the implementation of reclamation as the mining front moves forward, without waiting for the dump to be completely filled in the boundary contours. Attention is also paid to the economic benefits of block-layer technology and the continuous lateral mining method, in the transition to which the overburden transporting costs can be significantly reduced, while the limitations of the proposed method’s implementation concern specific coal deposits that make up a small part of the fields being developed today by surface mining.


Author(s):  
Marina I. Potapchuk ◽  
◽  
Igor Iu. Rasskazov ◽  
Svetlana I. Korneeva ◽  
Mikhail A. Lomov ◽  
...  

2018 ◽  
Vol 6 ◽  
pp. 38-44
Author(s):  
S.Yu. Nikolashin ◽  
◽  
Yu.M. Nikolashin ◽  
Ya.V. Kebal ◽  
◽  
...  

Sign in / Sign up

Export Citation Format

Share Document