Collusion within the UK Construction Industry, An Ethical Dilemma

2021 ◽  
pp. 327-336
Author(s):  
Joseph Thorp ◽  
Hadi Kazemi
Buildings ◽  
2021 ◽  
Vol 11 (6) ◽  
pp. 260
Author(s):  
James Ellis ◽  
David John Edwards ◽  
Wellington Didibhuku Thwala ◽  
Obuks Ejohwomu ◽  
Ernest Effah Ameyaw ◽  
...  

This research explores the failure of competitively tendered projects in the UK construction industry to procure the most suited contractor(s) to conduct the works. Such work may have equal relevance for other developed nations globally. This research seeks to teach clients and their representatives that “lowest price” does not mean “best value”, by presenting a case study of a successfully negotiated tender undertaken by a small-to-medium enterprise (SME) contractor; SME studies are relatively scant in academic literature. By applying the “lessons learnt” principle, this study seeks to improve future practice through the development of a novel alternative procurement option (i.e., negotiation). A mixed philosophical stance combining interpretivism and pragmatism was used—interpretivism to critically review literature in order to form the basis of inductive research to discuss negotiation as a viable procurement route, and pragmatism to analyse perceptions of tendering and procurement. The methods used follow a three-stage waterfall process including: (1) literature review and pilot study; (2) quantitative analysis of case study data; and (3) qualitative data collection via a focus group. Our research underscores the need to advise clients and their representatives of the importance of understanding the scope of works allowed within a tender submission before discounting it based solely on price. In addition, we highlight the failings of competitive tendering, which results in increased costs and project duration once the works commence on site. These findings provide new contemporary insight into procurement and tendering in the construction industry, with emphasis on SME contractors, existing relationships, and open-book negotiation. This research illustrates the adverse effects of early cost estimates produced without first securing a true understanding of project buildability and programming. Our work concludes with a novel insight into an alternative procurement option that involves early SME contractor involvement in an open-book environment, without the need for a third-party cost control.


2014 ◽  
Vol 32 (4) ◽  
pp. 315-330 ◽  
Author(s):  
Michelle C. Brennan ◽  
Alison J. Cotgrave

Purpose – Despite the surge of interest in construction sustainability and the many Government initiatives encouraging reform in the UK construction industry (CI), the prevalence of sustainable development (SD) in the industry is still largely lagging behind that of other industries. Given the amount of focus and activity identified nationally in this area, the purpose of this paper is to investigate the reasons why this is not being translated into action and to seek counsel from industry professionals as to how they believe change can be achieved with a particular focus on how they believe higher education institutions (HEIs) can contribute. Design/methodology/approach – An explorative, qualitative study using three focus groups was of construction professionals. Findings – Despite a lack of action, many in industry support sustainability and actively attempt to engage in sustainable practices but a number of barriers preclude successful implementation. Government initiatives are having a positive impact, with participants believing that both Government and HEIs are imperative in driving the sustainability agenda forward. Research limitations/implications – Whilst limited in scale, this paper highlights the current state of the CI in relation to SD and evidences that progress is being made albeit slowly. The findings may help both Government and HEIs alongside industry in achieving how this can be overcome. Originality/value – Previous research in this area has generally adopted a quantitative approach. Adopting a qualitative approach provides a more in depth view as to why the status quo remains with regards to SD in the CI.


2010 ◽  
Vol 3 (3) ◽  
pp. 247
Author(s):  
Adekunle Sabitu Oyegoke ◽  
Peter McDermott ◽  
Michael Dickinson
Keyword(s):  

Author(s):  
Habeeb Kusimo ◽  
Lukumon Oyedele ◽  
Olugbenga Akinade ◽  
Ahmed Oyedele ◽  
Sofiat Abioye ◽  
...  

Purpose The purpose of this paper is to identify challenges faced in resource management in the UK construction industry and to propose some solutions to these problems. Design/methodology/approach Based on a qualitative research methodology, 14 experts from the UK construction industry were chosen to be participants in the study. The participants were equally divided into two focus groups to discuss resource management using five projects as case studies. Thematic analysis of the discussion reveals seven key factors that affect resource management. Findings The results show that most of the problems identified are due to poor data management processes and the practice of having data in silos. Overcoming this challenge requires the adoption of big data approaches for resource management to allow the integration of large and different forms of data. Originality/value This study seeks to bring to the fore challenges faced in resource management by the UK construction industry and to outline some solutions to address them.