Determinants of Construction Project Success in India

2013 ◽  
Author(s):  
Kumar Neeraj Jha
2021 ◽  
Vol 13 (8) ◽  
pp. 4513
Author(s):  
Summaira Malik ◽  
Muhammad Taqi ◽  
José Moleiro Martins ◽  
Mário Nuno Mata ◽  
João Manuel Pereira ◽  
...  

The success of a construction project is a widely discussed topic, even today, and there exists a difference of opinion. The impact of communication and conflict on project success is an important, but least addressed, issue in literature, especially in the case of underdeveloped countries. Miscommunication and conflict not only hinder the success of a project but also may lead to conflicts. The focus of this paper was to examine the impact of communication on project success with the mediating role of conflict. By using SPSS, demographics, descriptive statistics and correlation were determined. Smart PLS version 3.0 was used for confirmatory factor analysis (CFA), internal accuracy and validity estimates, hypothesis checking and mediation testing. The results showed that formal communication has a negative impact on the success of a construction project, resulting in conflicts among project team members, whereas informal communication and communication willingness have a positive impact on project success because people tend to know each other, and trust is developed. Task, process and relationship conflicts were used as mediating variables. It was found that task conflict effects the relations positively because project team members suggest different ways to do a certain task, and, hence, project success is achieved. On the contrary, process conflict and relationship conflict have a negative impact on communication and project success. Both of these conflicts lead to miscommunication, and project success is compromised. Hence, it is the responsibility of the project manager to enhance communication among project team members and to reduce the detrimental effects of process and relationship conflict on project success.


2021 ◽  
Vol ahead-of-print (ahead-of-print) ◽  
Author(s):  
Masoud Zavari ◽  
Mohammad Reza Afshar

PurposeIn the construction industry, site managers are responsible for the day-to-day on-site running of a project. Site managers are required not only to ensure that work is done safely, on time, within budget and to the right quality standards, but also to manage any delays or problems encountered on-site during a construction project. Thus, a site manager has a significant position in the success of a construction project. However, there is a lack of studies considering the role of the leadership style of a site manager in construction project success. In this study, not only the effect of the transformational leadership (TL) style of site managers on the success of construction projects is assessed, but also the mediating role of team-building (TB) and team innovation between TL and project success is studied.Design/methodology/approachThe proposed hypotheses are tested by comparing the performance criteria of construction projects with the TL style of site managers. The success criteria of the projects are examined using project documents and client opinions, and the TL of site managers, TB aspects and team innovation in projects are assessed by asking from their subordinates. The Pearson correlation coefficient is employed to investigate the relation between every two variables.FindingsThe results illustrate that the TL of a site manager is directly related to project success; thus, the findings would confirm the importance of selecting appropriate site managers for construction projects. Moreover, while there is a mediating role of TB between TL and construction project success, team innovation does not have a mediating impact in design-bid-build (DBB) construction projects.Originality/valueAs there is a lack of studies assessing the TL effects on the success of construction projects and the significant role of site managers, this study is one of the first researches that tested these impacts and evaluated the mediating role of TB and team innovation between TL and project performance.


Companies try to use better techniques to deal with complex projects. The maturity of companies to apply these better techniques can guarantee project success or not. The environment, where the engineering and construction project is developed, also has influence over the success. The maturity of a company's project management processes is also a factor of success. This chapter aims to talk about concepts related to engineering and construction initiatives.


2012 ◽  
Vol 30 (6) ◽  
pp. 463-475 ◽  
Author(s):  
Liisa Lehtiranta ◽  
Sami Kärnä ◽  
Juha-Matti Junnonen ◽  
Päivi Julin

2019 ◽  
Vol 9 (3) ◽  
pp. 364-382 ◽  
Author(s):  
Ernest Kissi ◽  
Kofi Agyekum ◽  
Bernard Kofi Baiden ◽  
Reuben Agyei Tannor ◽  
George Effah Asamoah ◽  
...  

Purpose Monitoring and evaluation (M&E) of projects is a very important aspect of project execution and management. This is because proper M&E practices have a significant effect on the successful delivery of projects. The purpose of this paper is to examine the impact of project M&E practices on construction project success criteria. Design/methodology/approach Structured questionnaires were used to solicit the views of project professionals in the Ghanaian construction industry. The questions were developed through critical review of literature and complemented with a pilot interview on the subject. This paper utilized a partial least square–structural equation modeling (PLS–SEM) to establish the impact of project M&E practices (constructs) on project success based on the hypothesis. Findings Results showed that M&E practices had a positive statistical significant relationship with construction project success criteria. In addition, health and safety performance and project scope showed a strong significant relation with M&E practice, implying that, in developing countries, these two main constructs should be given critical attention in achieving project success. Practical implications The findings of this study may be useful to organizations in determining M&E techniques that are relevant and contribute highly to project success. This may go a long way to increase productivity and accelerate the rate of successful project delivery. Originality/value The application of rigorous analysis, PLS–SEM, gives a more reliable information on M&E practices that can ensure successful delivery of construction projects.