Built Environment Project and Asset Management
Latest Publications


TOTAL DOCUMENTS

420
(FIVE YEARS 179)

H-INDEX

19
(FIVE YEARS 6)

Published By Emerald (Mcb Up )

2044-124x

2021 ◽  
Vol ahead-of-print (ahead-of-print) ◽  
Author(s):  
Sanduni Peiris ◽  
Nayanthara De Silva

Purpose Factory acceptance testing (FAT) in the construction industry has been severely hampered due to restrictions in cross-border travel resulting from the COVID-19 pandemic. Consequently, virtual FAT (vFAT) became a popular substitute for physical FAT. However, the credibility of vFAT is being questioned because it was adopted without much scrutiny. Hence, this study is aimed at investigating vFATs and re-engineering the FAT process to suit an effective vFAT environment.Design/methodology/approach A comprehensive literature search on FAT procedures was followed by two stages of expert interviews with eight leading subject experts and a case study. The findings were analysed using code-based content analysis on NVivo software.Findings Strengths of vFATs include “reduction in cost and time consumed”, “flexibility for more participants” and “faster orders”. Most emphasized weaknesses include “lack of reliability” and “lack of technology transfer”. vFAT has mostly increased test reliability by “improving accessibility” and has decreased reliability by “restricting physical touch and feel observation of the equipment”. A four-step vFAT process was developed with a noteworthy additional step called “Pre-FAT Meeting”.Research limitations/implications The scope of this study is limited to the Sri Lankan construction industry. Expansion of the geographical area of focus is recommended for future studies.Originality/value The findings of this study unveil a vFAT process, which is timely and beneficial for construction practitioners to optimize and enhance the effectiveness of vFATs which are currently conducted in a disarranged manner.


2021 ◽  
Vol ahead-of-print (ahead-of-print) ◽  
Author(s):  
Sundararaman Krishnamoorthi ◽  
Benny Raphael

PurposeThe aim of this paper is to synthesize knowledge related to performance evaluation of automated construction processes during the planning and execution phases through a theme-based literature classification. The primary research question that is addressed is “How to quantify the performance improvement in automated construction processes?”Design/methodology/approachA systematic literature review of papers on automated construction was conducted involving three stages-planning, conducting and reporting. In the planning stage, the purpose of the review is established through key research questions. Then, a four-step process is employed consisting of identification, screening, shortlisting and inclusion of papers. For reporting, observations were critically analysed and categorized according to themes.FindingsThe primary conclusion from this study is that the effectiveness of construction processes can only be benchmarked using realistic simulations. Simulations help to pinpoint the root causes of success or failure of projects that are either already completed or under execution. In automated construction, there are many complex interactions between humans and machines; therefore, detailed simulation models are needed for accurate predictions. One key requirement for simulation is the calibration of the models using real data from construction sites.Research limitations/implicationsThis study is based on a review of 169 papers from a database of peer-reviewed journals, within a time span of 50 years.Originality/valueGap in research in the area of performance evaluation of automated construction is brought out. The importance of simulation models calibrated with on-site data within a methodology for performance evaluation is highlighted.


2021 ◽  
Vol ahead-of-print (ahead-of-print) ◽  
Author(s):  
Don Amila Sajeevan Samarasinghe ◽  
Imelda Saran Piri

PurposeThe purpose of this paper is to evaluate the impact of visual models on the ability of construction students to assess design buildability.Design/methodology/approachThe study engaged 45 construction students from one selected tertiary education institute in New Zealand. The data collection process involved meeting the students face-to-face and demonstrating the VR model to them, after which the students completed an online questionnaire and assessed design buildability using both 2D drawing and virtual reality (VR) models. To make this assessment, the participants considered a residential earth building modelled to promote sustainable building features. The assessment process required the participants to evaluate the design buildability of the same building design using a 2D drawing and a 3D VR model.FindingsThe study found that VR models have significant advantages for assessing design buildability. Students measured 16.80% higher average buildability with the 3D VR model compared to the 2D drawing. The participants in the evaluation felt that the visual model significantly improved the comprehensibility of complex designs, which helped identify and manage design buildability (overall, 83% of participants strongly supported this).Originality/valueThe paper showed construction digitisation such as VR, augmented reality and building information modelling is highly cooperative as it can easily be made available for online learning. Thus, the findings support construction educators use online-based VR learning to promote efficient teaching of design buildability to students.


2021 ◽  
Vol 12 (1) ◽  
pp. 1-4
Author(s):  
Niluka Domingo ◽  
Monty Sutrisna
Keyword(s):  

2021 ◽  
Vol ahead-of-print (ahead-of-print) ◽  
Author(s):  
Nguyen Van Du ◽  
Le Dinh Thuc ◽  
Huu-Bang Tran

PurposePublic-Private Partnership (PPP) model still contains the obstacle in partnership, which can lead to different satisfaction between project participants. Therefore, project managers need to consider stakeholder satisfaction to ensure success in PPP implementation. However, this problem is limited in the previous studies in developing countries. The purpose of this study is to evaluate stakeholder satisfaction of PPP transport projects in developing countries.Design/methodology/approachA total of 15 satisfaction factors were identified and four main groupings were introduced by a review of the literature and expert interview rounds, including satisfaction of general public, satisfaction of private sector, satisfaction of government and satisfaction of end-users. A PPP expressway project in Vietnam was used to illustrate for this analysis. Data were collected through a questionnaire survey with 31 validated responses. The fuzzy synthetic evaluation method was then applied to evaluate satisfaction index for the stakeholder satisfaction of PPP transport projects in Vietnam as a developing country.FindingsThe analyzed result showed that the project participants are basically satisfied with gained outcomes of the experimental project with the satisfaction index = 3.46. Specifically, the general public expressed that they are “satisfied” with satisfaction index = 4.08. Meanwhile, end-users, government and private sector are “basically satisfied” with the project outcome (the satisfaction index of 3.31, 3.16 and 3.04, respectively).Originality/valueThis study provides more depth understanding of the satisfaction factor with transport infrastructure service in developing countries through PPP procurement. In addition, the decision-makers might utilize this evaluation model for rating the stakeholder satisfaction of real PPP projects to ensure project success.


2021 ◽  
Vol ahead-of-print (ahead-of-print) ◽  
Author(s):  
Md. Obidul Haque ◽  
Jayedi Aman ◽  
Fahim Mohammad

PurposeThis paper addresses housing problems of coastal areas in Bangladesh and investigates container-modular-housing (CMH) as a potential sustainable solution that establishes a resilient community.Design/methodology/approachPrimary data highlight the underlying challenges of coastal-housing developed by monitoring the day-to-day operations of the community and conducting interviews with community members. Secondary data came from existing literature on coastal-housing rules and regulations, CMH and similar ideas. The study used a hypothetical CMH cluster design, with three primary objectives in mind: future settlement re-arrangement, economic sustainability and environmental sustainability. To achieve the objectives, the research used a comparative examination of the current constructed form and CMH, as well as a computer-aided simulation approach.FindingsPrimary findings encompass issues of a given coastal area, including surrounding site studies, sustainability and resiliency demands due to broad exposure to the natural calamities. Driving toward a “CMH” based home design has the ability to create strategies for a resilient and sustainable community development while taking three primary objectives into account.Research limitations/implicationsA pilot project is needed to analyze the socio-cultural impact and overall construction feasibility.Practical implicationsThis research could be implemented to transform an informal construction system into a technical, resilient, sustainable architectural and engineering solution to build resilient communities.Originality/valueNumerous research projects have focused on the environmental sustainability of CMH. However, this study focuses on construction sustainability considering three major aspects which are yet to be addressed.


2021 ◽  
Vol ahead-of-print (ahead-of-print) ◽  
Author(s):  
Chipozya Kosta Tembo ◽  
Franco Muleya ◽  
Emmanuellie Phiri

PurposeThis research aimed to investigate the extent to which organisational culture is practised in local and foreign contractors in grade one and two categories and how it affects their performance.Design/methodology/approachThe approach for this research was positivist in nature adopting a mono-method of data collection through a survey using self-administered questionnaires. A total of 138 questionnaires were distributed among public clients and large-scale contractors registered in the stated grades, and 112 questionnaires were returned for analysis representing an overall response rate of 81% for contractors and clients.FindingsFindings revealed that in organisational culture, significant differences were found for management style and dominant characteristics of the organisation between local and foreign contractors. Differences were not found for leadership styles, measures of success and organisational glue. Results suggest that for local contractors to perform better, significant changes are needed to their management style and dominant characteristics of their organisations.Originality/valueForeign contractors in the Zambian construction industry are reportedly outperforming local contractors making them preferred contractors on larger public projects accounting for 85% of construction projects by value of works. This study presents the differences in organisational culture between foreign and local firms. It further demonstrates that organisational culture plays a key role in determining performance of a contracting firm. The study presents areas that local contractors can improve in organisational culture in order to remain competitive.


2021 ◽  
Vol ahead-of-print (ahead-of-print) ◽  
Author(s):  
Henry Duncan John Mwamvani ◽  
Christopher Amoah ◽  
Emma Ayesu-Koranteng

PurposeThe study aims to find the causes of road projects implementation delays in Blantyre, one of the four city councils (CCs) in Malawi.Design/methodology/approachThe study followed a qualitative research approach using a Blantyre City Council (BCC) as a case study. This study combined in-depth, face-to-face interviews with councillors, secretariat staff, consultants, and contractors who worked on the city's road projects. Data gathered were analysed using thematic content analysis. Also, some road project documents were examined.FindingsThe findings from the case study revealed the primary cause of road project construction delays as the shortage of engineers in conducting detailed proposed projects surveys resulting in incomplete project scope definition before contractor's procurement. Other identified factors were service providers delaying the removal of existing public utility infrastructure from project sites, client funding issues, scope changes, and client delays in issuing instructions to the contractors during project implementation. Another factor was the shortage of construction equipment and construction materials experienced by some appointed contractors.Research limitations/implicationsOnly road construction projects and stakeholders operating from Blantyre city, Malawi, were contacted for the study; thus, the findings may not be generalizable.Practical implicationsThere is an urgent need to increase technical employees, especially engineers and other critical technical staff such as quantity surveyors in Blantyre. Employees' conditions of service should be conducive to attract qualified people to undertake effective management and assessment of projects before commencement to identify the feasibility of proposed projects to decrease the rate of road construction project delays.Originality/valueThe study has established Blantyre city's core challenges in implementing its road projects seamlessly and has provided mitigation measures for dealing with the shortcomings.


2021 ◽  
Vol ahead-of-print (ahead-of-print) ◽  
Author(s):  
Aminah Robinson Fayek ◽  
Alireza Golabchi

PurposeThe purpose of this study is to provide a framework to identify performance metrics for evaluating research and development collaborations.Design/methodology/approachThe framework is developed through a review of similar centres and academic studies, followed by surveys and interviews of researchers and industry practitioners for the case of the Construction Innovation Centre (CIC). The proposed framework consists of identification of existing industry research and development needs, development of a research roadmap representing top research priorities, and identification of the most important services to provide to industry partners, which form the context for defining performance evaluation metrics.FindingsA research roadmap is presented, outlining top research areas and methods and a list of the most in-demand services including research, practical and training and outreach services. Metrics for evaluating the performance of proposed projects, completed projects and a collaborative research centre are also identified.Originality/valueThis study presents a novel approach to defining performance metrics for the evaluation of research and development collaborations. The approach and findings of this study can be adopted by other collaborative research centres and initiatives around the world to develop effective metrics for performance measurement. The proposed framework provides a platform for defining performance metrics in the context of the research roadmap and top-priority services applicable to the research and development collaboration.


2021 ◽  
Vol ahead-of-print (ahead-of-print) ◽  
Author(s):  
Imriyas Kamardeen

PurposeCardiovascular diseases (CVDs) are responsible for one-third of global deaths. Work stress is a major risk factor for CVDs in the workforce. Construction professionals endure excessive work stress, yet their vulnerability to CVDs remains underexplored. The study investigated the prevalence of CVDs among construction professionals and its relationships to job stressors, stress coping methods and socio-demographics.Design/methodology/approachAn online survey was conducted among construction professionals in Australia wherein data related to job stressor experiences, stress management methods adopted, and incidents of CVDs were collected. Structural path analysis was conducted to discover associations.FindingsJunior level professionals reported higher incidents of angina and heart muscle weakening than others. Statistically significant positive associations were discovered between the reported CVDs, and job stressors such as excessive workload, unpredictable work hours, lack of support, discrimination and work–life conflict and negative stress coping methods such as consuming alcohol and/or drugs, emotional eating and aggression. However, no evidence was found to support the claim that demographic factors such as age and gender were also risk factors for CVDs.Originality/valueThe workers' compensation system provides financial protection to injured employees. It extends similar protection for work-related illnesses; however, it is more difficult to prove work-related causes for illnesses. The study provides scientific evidence to support the recognition of CVDs among construction professionals as work-related diseases, mediated by work stress.