Numerical simulation of the interface molten metal air in the shot sleeve chambre and mold cavity of a die casting machine

2011 ◽  
Vol 47 (11) ◽  
pp. 1465-1478 ◽  
Author(s):  
Abdel Illah Nabil Korti ◽  
Said Abboudi
2019 ◽  
Vol 15 (6) ◽  
pp. 1255-1273
Author(s):  
Korti Mohammed Choukri ◽  
Korti Abdel Illah Nabil ◽  
Abboudi Said

Purpose High-pressure die casting is one of the manufacturing techniques used for the rational mass production of metal parts. Due to the high velocity of the molten metal during the injection phase, the die casting of aluminum is so complex and it is almost impossible to calculate these exact performances. Numerical simulation is an effective way to optimize the injection phase and minimize air entrapment that causes porosity defects in the metal. Generally, the filling phase of the molten metal in the shot sleeve is neglected in most scientific work. This phase is followed by a rest period to allow the escape of the resident air bubbles (gravity effect). The paper aims to discuss these issue. Design/methodology/approach It is relatively clear that the model described poses a great challenge for numerical implementation, especially for 3D geometries. The governing transport equations are solved numerically using the commercial CFD solver Fluent and the equations are discretized using a pressure-based finite volume method. The coupling pressure–velocity was solved by the PISO algorithm. The PISO algorithm takes relatively more CPU time per solver iteration, but it significantly decreases the number of iterations required for the convergence of the transient flow problems. Laminar flow inside air and molten metal was assumed. In order to describe the behavior of the molten metal, a VOF model has been activated. The model makes it possible to account for the moving boundary due to the variation of the shot sleeve volume caused by the plunger displacement. The scheme used in the discretization of momentum equation was the first-order upwind scheme, and the scheme used for the pressure was the PRESTO. The profile of the plunger velocity, boundary conditions change with time and the physical properties change with liquid fraction were used by implementation of a user-defined function. For the discretization of the domain, an unstructured mesh with triangular elements is used. After conducting mesh sensitivity study, a mesh having 53,813 triangular elements has been chosen for the present study. The convergence criterion was set equal to 10–4 for all parameters. Findings The results show that the rest and global filling times increase by 2.5 and 8.57 percent with decreasing the pouring velocity by 10 percent. In addition, the rest and global filling times decrease by 5.77 and 8.12 percent with increasing the pouring velocity by 10 percent. Originality/value After the filling phase, it is necessary to offer a rest period before the injection phase. However, the rest and global filling times increase by 2.5 and 8.57 percent with decreasing the pouring velocity by 10 percent. In addition, the rest and global filling times decrease by 5.77 and 8.12 percent with increasing the pouring velocity by 10 percent. Increasing the pouring velocity by 10 percent leads increasing of the molten metal velocity in the shot sleeve and requires a delay of time of the beginning of the faster plunger movement by 7–10.5 percent. On the other hand, Figure 12 shows that increasing the pouring velocity requires increasing of the plunger velocity during the injection phase, thus increasing the pouring velocity. In order to overcome this problem, it is necessary to reduce the injection velocity and prolong the period of the slower plunger movement.


2008 ◽  
Vol 141-143 ◽  
pp. 97-102 ◽  
Author(s):  
J. Wannasin ◽  
S. Junudom ◽  
T. Rattanochaikul ◽  
M.C. Flemings

A simple and efficient rheocasting process that has recently been invented is being developed for aluminum die casting applications. The process called Gas Induced Semi-Solid (GISS) utilizes the combination of local rapid heat extraction and agitation achieved by the injection of fine gas bubbles through a graphite diffuser to create semi-solid slurry. In the GISS process, the die casting machine and the process cycle remain little changed from those of conventional die casting. The GISS unit creates a low solid fraction of semi-solid slurry in the ladle during the ladle transfer to the shot sleeve. The semi-solid slurry is then poured directly into the shot sleeve. This paper presents the detailed description of the process. The results of the semi-solid die casting experiments with ADC10 alloy using the GISS process are also reported and discussed.


2021 ◽  
Vol 11 (1) ◽  
pp. 97-109
Author(s):  
Suraj R. Marathe ◽  
Dr. Carmo E. Quadros

A numerical simulation approach is proposed to predict the optimal parameter setting during high pressure die casting. The contribution from the optimal parameters, the temperature, showed more influence on the casting quality than the other parameters. This study’s outcome was beneficial for finding the solution for casting defects that occurs due to incorrect setting of process parameters in die casting. Thus, a combination of numerical optimisation techniques and casting simulation serves as a tool to improve the casting product quality in die casting industries. This paper aims to analyse and optimise critical parameters like injection pressure, molten metal temperature, holding time, and plunger velocity, contributing to the defects. In this research paper, an effort has been made to give optimal pressure, temperature, holding time, and plunger velocity parameters using ProCAST simulation software that uses finite element analysis technology. Numerical analysis for optimising the parameters by varying the temperature of molten metal, injection pressure, holding time, and plunger velocity,  concerning solidification time at hot spots, is an essential parameter for studying the defect analysis in the simulated model.