Uncertainty budgeting at a field laboratory made simple: combining the uncertainty of the field measurement and of the ”stated reference"?

2002 ◽  
Vol 7 (3) ◽  
pp. 89-89
Author(s):  
Paul De Bièvre
Sign in / Sign up

Export Citation Format

Share Document