Sand Deposit Arrangement and Construction Optimization for Large-section Immersed Tube Tunnel Foundations via the Sand Flow Method
2017 ◽
Vol 54
(5)
◽
pp. 324-329
◽
2014 ◽
Vol 40
◽
pp. 102-108
◽
2021 ◽
Vol 719
(3)
◽
pp. 032091
2013 ◽
Vol 20
(10)
◽
pp. 2840-2848
2014 ◽
pp. 1164-1164
1970 ◽
Vol 28
◽
pp. 494-495
Keyword(s):
2001 ◽
Vol 148
(4)
◽
pp. 375
2018 ◽
Keyword(s):