SEMA: A Site Equipment Management Assistant for Construction Management

Author(s):  
Meng-Han Tsai ◽  
Cheng-Hsuan Yang ◽  
Chen-Hsuan Wang ◽  
I.-Tung Yang ◽  
Shih-Chung Kang
2011 ◽  
Vol 120 ◽  
pp. 603-608
Author(s):  
Tian Xiong Yang ◽  
Shun Tian Yang ◽  
Mei Wu Peng

Projects, construction equipment management is the process of the project and construction management of production factors is an important component. Construction equipment on the project configuration, use, cost accounting and other comprehensive systematic study, given the optimal configuration and dynamic management decision-making programs, to achieve their project goals.


Author(s):  
Kimiharu Onda ◽  
Masatoshi Takada ◽  
Hisako Okada ◽  
Kazuto Tatehora

Hitachi has so far developed the construction management system with information technology since more than twenty years ago. As the recent results, we developed the advanced new functions and applied them to the Nuclear Power Plant (NPP)’s under construction. RFID-applied construction management method with personal digital assistant (PDA) could realize more reliable and efficient construction control on a site. By enhancing an Integrated Schedule Planning function, the construction scheme could be more accurately and speedily developed, which made it possible to realize the standardization of schedule planning, the linkage with other systems, and the improvement of operability. By applying these new technologies to Hitachi construction management, Hitachi can supply the nuclear power plant with higher quality, safety, and reliability.


Author(s):  
O.L. Krivanek ◽  
J. TaftØ

It is well known that a standing electron wavefield can be set up in a crystal such that its intensity peaks at the atomic sites or between the sites or in the case of more complex crystal, at one or another type of a site. The effect is usually referred to as channelling but this term is not entirely appropriate; by analogy with the more established particle channelling, electrons would have to be described as channelling either through the channels or through the channel walls, depending on the diffraction conditions.


Author(s):  
Fred Eiserling ◽  
A. H. Doermann ◽  
Linde Boehner

The control of form or shape inheritance can be approached by studying the morphogenesis of bacterial viruses. Shape variants of bacteriophage T4 with altered protein shell (capsid) size and nucleic acid (DNA) content have been found by electron microscopy, and a mutant (E920g in gene 66) controlling head size has been described. This mutant produces short-headed particles which contain 2/3 the normal DNA content and which are non-viable when only one particle infects a cell (Fig. 1).We report here the isolation of a new mutant (191c) which also appears to be in gene 66 but at a site distinct from E920g. The most striking phenotype of the mutant is the production of about 10% of the phage yield as “giant” virus particles, from 3 to 8 times longer than normal phage (Fig. 2).


2014 ◽  
Vol 222 (1) ◽  
pp. 37-48 ◽  
Author(s):  
Stephanie Romney ◽  
Nathaniel Israel ◽  
Danijela Zlatevski

The present study examines the effect of agency-level implementation variation on the cost-effectiveness of an evidence-based parent training program (Positive Parenting Program: “Triple P”). Staff from six community-based agencies participated in a five-day training to prepare them to deliver a 12-week Triple P parent training group to caregivers. Prior to the training, administrators and staff from four of the agencies completed a site readiness process intended to prepare them for the implementation demands of successfully delivering the group, while the other two agencies did not complete the process. Following the delivery of each agency’s first Triple P group, the graduation rate and average cost per class graduate were calculated. The average cost-per-graduate was over seven times higher for the two agencies that had not completed the readiness process than for the four completing agencies ($7,811 vs. $1,052). The contrast in costs was due to high participant attrition in the Triple P groups delivered by the two agencies that did not complete the readiness process. The odds of Triple P participants graduating were 12.2 times greater for those in groups run by sites that had completed the readiness process. This differential attrition was not accounted for by between-group differences in participant characteristics at pretest. While the natural design of this study limits the ability to empirically test all alternative explanations, these findings indicate a striking cost savings for sites completing the readiness process and support the thoughtful application of readiness procedures in the early stages of an implementation initiative.


1976 ◽  
Vol 37 (C6) ◽  
pp. C6-23-C6-28 ◽  
Author(s):  
L. BROSSARD ◽  
H. OUDET ◽  
P. GIBART
Keyword(s):  

2020 ◽  
pp. 46-51
Author(s):  
M. V. Kolmakova

The article considers an innovative form of interaction between an educational organization and parents of students with autism spectrum disorder in inclusive education environment. A site developed by the author is presented, on the basis of which it is planned to implement pedagogical support for parents of students with autism spectrum disorder. The structure and approximate content of such a site are described. Each section of the site corresponds to certain areas of activity within the framework of pedagogical support of parents.


Sign in / Sign up

Export Citation Format

Share Document