Using Surveying Instruments in Monitoring 3D Deformations of RC Structure Subjected to Differential Settlement of Its Footings

Author(s):  
Sabry Fayed ◽  
Walid Mansour ◽  
Magda H. Farhan
2011 ◽  
Vol 71-78 ◽  
pp. 32-36 ◽  
Author(s):  
Xin Jiang Wei ◽  
Jie Hong ◽  
Gang Wei

Considering the interaction of building-soil-tunnel, the grillage beams foundation frame building vertical crossed by Double-O-Tube (DOT) shield tunnel was simulated by 3D MIDAS/ GTS software, and the impact of construction on the building was analyzed. The results show that: the ground settlement trough caused by DOT shield tunnel can be fitted by peck formula; during the passage of the shield tunneling through the building, the settlement of the building increased and settlement trough was wilder; the settlement was stable and had a little rebound when shield machine already passed the building; with the increase of driving distance, the first principal stress P1 increased and then was stable; with the increase of L, the shape of foundation settlement curve changed, and the maximum differential settlement between columns increased but was small.


Author(s):  
Qiang Luo ◽  
Ming Wei ◽  
Qingyuan Lu ◽  
Tengfei Wang

AbstractPiled embankments have been extensively used for high-speed rail over soft soils because of their effectiveness in minimizing differential settlement and shortening the construction period. Stress concentration ratio, defined as the ratio of vertical stress carried by pile heads (or pile caps if applicable) to that by adjacent soils, is a fundamental parameter in the design of piled embankments. In view of the complicated load transfer mechanism in the framework of embankment system, this paper presents a simplified analytical solution for the stress concentration ratio of rigid pile-supported embankments. In the derivation, the effects of cushion stiffness, pile–soil interaction, and pile penetration behavior are considered and examined. A modified linearly elastic-perfectly plastic model was used to analyze the mechanical response of a rigid pile–soil system. The analytical model was verified against field data and the results of numerical simulations from the literature. According to the proposed method, the skin friction distribution, pile–soil relative displacement, location of neural point, and differential settlement between the pile head (or cap) and adjacent soils can be determined. This work serves as a fast algorithm for initial and reasonable approximation of stress concentration ratio on the design aspects of piled embankments.


1981 ◽  
Vol 107 (6) ◽  
pp. 1129-1140 ◽  
Author(s):  
Petar Krpan ◽  
Michael P. Collins
Keyword(s):  

Sign in / Sign up

Export Citation Format

Share Document