scholarly journals Comparative analysis of design/build and design/bid/build project delivery systems in Lebanon

2019 ◽  
Vol 15 (S1) ◽  
pp. 147-152 ◽  
Author(s):  
Hadi Abou Chakra ◽  
Amina Ashi
2016 ◽  
Vol 13 (2) ◽  
pp. 81 ◽  
Author(s):  
Sabihah Saaidin ◽  
Intan Rohani Endut ◽  
Abu Samah Abu Samah ◽  
Ahmad Ruslan Mohd Ridzuan

This paper discusses the design-build project delivery method which is becoming an increasingly viable alternative to traditional project delivery method in the public sector. This interest has led to dialogue among public sector agencies to establish and formalise understanding of the design-build process and its implementation. The process consists of six stages namely Project Definition, Request for Qualification, Request for Proposal, Proposal Submission and Evaluation, Contract Award, and Document/Construction. Therefore, this finding of Design-Build (DB) procurement process is on the improvement and understanding on an owner and contractor in practice and implementation in Malaysia.  Keywords: design/build, design/bid/build, advantage and disadvantage, procurement process


Author(s):  
Birtice Garner ◽  
Kathleen Richardson ◽  
Daniel Castro-Lacouture

Design-Build is rapidly becoming one of the most commonly used project delivery methods in the facility construction industry. The United States Air Force and the Air Force Reserve Command (AFRC) are expected to establish a target of 75% of all Military Construction (MILCON) projects delivered using the Design-Build method. The use of this delivery method will bring significant changes in the relationships between the various parties associated with facility project delivery when compared to the traditional Design-Bid-Build method. This paper demonstrates that Design-Build delivery with a best value selection is an important tool in accomplishing AFRC’s cost efficient, rapid response transformation goals applicable to facility construction. Three hundred thirty two projects in program years 2002 through 2006, constructed using both traditional Design-Bid-Build or Design-Build delivery methods, were examined. Parameters used for comparisons were construction cost and schedule growth, project cost, vertical versus horizontal construction, and number of days required to prepare solicitation documents, advertise and accomplish construction award. This research reveals significant project schedule advantages with Design-Build best value selection delivery. The advantages are apparent in both pre and post construction award activities. Potential Design-Build cost advantages are hindered by Defense Federal Acquisition Regulations requiring firm fixed price contracts at construction award.


2009 ◽  
Vol 135 (7) ◽  
pp. 579-587 ◽  
Author(s):  
Darren R. Hale ◽  
Pramen P. Shrestha ◽  
G. Edward Gibson ◽  
Giovanni C. Migliaccio