Application of a New Vacuum Preloading Method for Tideland Reclamation in Wenzhou, China

Author(s):  
Yuang-qiang Cai ◽  
Jun Wang ◽  
Jian-jun Ma
2018 ◽  
Vol 58 (3) ◽  
pp. 766-775 ◽  
Author(s):  
Jun Wang ◽  
Yuanqiang Cai ◽  
Hongtao Fu ◽  
Xiuqing Hu ◽  
Ying Cai ◽  
...  

2020 ◽  
Vol 2020 ◽  
pp. 1-9
Author(s):  
Yunliang Cui ◽  
Jianbo Tu ◽  
Xinquan Wang ◽  
Hongguo Diao ◽  
Qianru Ge

The design method of electroosmosis-vacuum preloading for soft foundation treatment is not systematic and complete, thereby restricting the application of the technology in engineering. A design method for the electroosmosis-vacuum preloading treatment of sand-interlayered soft foundation is therefore presented. A compressible electrical prefabricated vertical drain is developed, and a vacuum sealing and draining system is designed for the application of the electroosmosis-vacuum preloading in sand-interlayered soft foundation. Calculation formulas of site resistance considering the interlayer and interface resistivity of the electrode are established to design the power supply and electrical circuit. A simple numerical simulation method is proposed to predict the ground settlement treated by electroosmosis-vacuum preloading. A field test of electroosmosis-vacuum preloading is designed using the suggested method, and comparison tests between the electroosmosis-vacuum preloading and the vacuum preloading are performed to verify the proposed technique. The test results show that the proposed design method is reasonable for the design of electroosmosis-vacuum preloading in engineering.


2019 ◽  
Vol 31 (9) ◽  
pp. 04019193 ◽  
Author(s):  
Huayang Lei ◽  
Yinggang Xu ◽  
Xin Li ◽  
Mingjing Jiang ◽  
Liangzhi Liu

2019 ◽  
Vol 38 (4) ◽  
pp. 493-510 ◽  
Author(s):  
Huayang Lei ◽  
Yao Hu ◽  
Gang Zheng ◽  
Jingjin Liu ◽  
Lei Wang ◽  
...  

2019 ◽  
Vol 38 (1) ◽  
pp. 122-131 ◽  
Author(s):  
Zhiwei Xie ◽  
Jun Wang ◽  
Hongtao Fu ◽  
Yuanqiang Cai ◽  
Hu Xiuqing ◽  
...  

2016 ◽  
Vol 35 (5) ◽  
pp. 631-642 ◽  
Author(s):  
Gang Zheng ◽  
Jingjin Liu ◽  
Huayang Lei ◽  
M. S. Rahman ◽  
Zaikun Tan

2012 ◽  
Vol 446-449 ◽  
pp. 1785-1790 ◽  
Author(s):  
Ai Min Liu ◽  
Shu Wang Yan

The marine cofferdams of the littoral new town in Lianyungang were constructed with geotextile bags filled with solidified soil and the soft ground under the cofferdams was treated by under water vacuum preloading method. The dimension of the cofferdams was reduced while the foundation kept stable. And the cofferdams were configurated with the geotextile bags filled with solidified soil, the silt clay was utilized adequately, the sand stone resource was saved and protected, the obvious effect was achieved. This method can be promoted in construction of marine cofferdams.


Sign in / Sign up

Export Citation Format

Share Document