Addressing interdisciplinary process engineering design, construction and operations through 4D virtual environments

Author(s):  
Ian Cameron ◽  
Caroline Crosthwaite ◽  
David Shallcross ◽  
Roger Hadgraft ◽  
Jo Dalvean ◽  
...  
Author(s):  
W Ernst Eder

Students learning design engineering at times need a good example of procedure for novel design engineering. The systematic heuristic-strategic use of a theory to guide the design process – Engineering Design Science – and the methodical design process followed in this case study is only necessary in limited situations. The full procedure should be learned, such that the student can select appropriate parts for other applications. Creativity is usually characterized by a wide search for solutions, especially those that are innovative. The search can be helped by this systematic and methodical approach. This case example is presented to show application of the recommended method, and the expected scope of the output, with emphasis on the stages of conceptualizing. The case follows a novel design problem of a mechanism to open and close the bow thruster covers for the Caravan Stage Barge.


Author(s):  
W. Ernst Eder

Students learning design engineering at times need a good example of procedure for novel design engineering. The systematic heuristic-strategic use of a theory to guide the design process – Engineering Design Science – and the methodical design process followed in this case study is only necessary in limited situations. The full procedure should be learned, such that the studentcan select appropriate parts for other applications.This case example is presented to show application of the recommended method, and the expected scope of the output, with emphasis on the stages of conceptualizing. The case follows a novel design problem of a gangway for ship-shore transfer for the Caravan Stage Barge.


2012 ◽  
Vol 209-211 ◽  
pp. 1359-1362
Author(s):  
Qin Luo

The construction drawing is a design document by which each construction party should abide. It is also a key element to affect construction project quality. So in the stage of supervision, the important thing that management engineers must grasp is blueprint-auditing. They should grasp the auditing principle, auditing method, auditing content and results,through which the problems existed among design, construction, process, engineering materials, equipments, etc. as well as those in each profession can be timely discovered. Through which, most design problems can be resolved before construction and the quality accident can be removed at its initial point. As a result, the construction time and cost can be saved a lot.


Sign in / Sign up

Export Citation Format

Share Document