BIM-based optimization of camera placement for indoor construction monitoring considering the construction schedule

2021 ◽  
Vol 130 ◽  
pp. 103825
Author(s):  
Xinyang Chen ◽  
Yifan Zhu ◽  
Hainan Chen ◽  
Yewei Ouyang ◽  
Xiaowei Luo ◽  
...  
2002 ◽  
Vol 46 (6-7) ◽  
pp. 151-158 ◽  
Author(s):  
L. Dallmer

This paper describes part of a program undertaken by South Sydney City Council to promote sustainable water management The aim of the project, named SQIRTS (Stormwater Quality Improvement & Reuse Treatment Scheme) was to demonstrate best-practice water management approaches, to learn from the process of implementing these, and to encourage the further use of these technologies. It comprises three main components located in a suburban park: a gross pollutant trap (GPT), a stormwater reuse system, and interpretative artworks that aim to educate and interpret the water processes within the park. Results from the pre-construction monitoring program are presented.


Author(s):  
Fangliang Chen ◽  
Kaihua Zeng ◽  
Xuejun Li ◽  
Manqing Xu ◽  
Hongtao Dai

Author(s):  
J.-J. Gonzalez-Barbosa ◽  
T. Garcia-Ramirez ◽  
J. Salas ◽  
J.-B. Hurtado-Ramos ◽  
J.-d.-J. Rico-Jimenez

2013 ◽  
Vol 405-408 ◽  
pp. 3423-3428
Author(s):  
Zhao Lin Li ◽  
Guo Zhi Zhang

Schedule control is the major issue in project management, and to predict the construction schedule effectively is important practically. The article mainly predicts the schedule of a project based on BP neural network. The result shows that the predicted value is more accurate than the value calculated by linear method.